My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4020 COLBY AVE 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
4020
>
4020 COLBY AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 3:25:24 PM
Creation date
1/27/2017 2:30:05 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4020
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> . �. <br /> ' INFORMATI04 FOR DEVELOPERt <br /> 1. Detall�d drarinqs in accordance with Ci[y Desiqr. •nd Construction <br /> Standard� sh�ll be •ub�itted to the Public Worka Department ehorinq sita <br /> parkinq layout, landacaping, utilitie�, ator■ drainaga, tcmporary <br /> conatruetion aroalon control, and all required ieproveaentn in the publio <br /> right-of-way. Public Horka Departeent approval of theee drarings i■ <br /> required prior to any permite beinq Laeued. All ieprovement� ahall be <br /> completed, approved, and warranted betore the Occupancy PerAit i■ ieaued. <br /> 2. City atreete and alleys are to be kept clear of dirt and debrie at all <br /> timea during conetruction. Uuet suppreaaion and atreet cleaning Awt <br /> occur ae directed by the Public Morks Inapector. <br /> 3. Perfornance quarantees are requlred for the allry and atreet improvements, <br /> includinq landecapinq. <br /> 4. Pernite nust be obtained for all fill recoved froo the aite and <br /> placed withln the City litits. It takei about 35 days (a SEPA review) to <br /> obtain permits for any apEcific eite. There ia currently a :ack o! <br /> Iadequate permitted fill sitea within tha City limits. <br /> 5. A one-year guarantee ia required on the public iaprovenent� for an <br /> amount not leea than 10X of the coet of construction and shall run for <br /> one year from the date of isauance of the firet Occupancy Pernit for <br /> the project. <br /> 6. Ae-built� of ators aewer and ■anitary sewer will be required to <br /> be aubAitted per City demign and conetruction •tancfard■ and <br /> specificationa. I <br /> 7. The propos�l ahould provide 40 to 50 feet of atarage of vehicles ■c � <br /> the driveMay■ throughout the site. If the aite layout rill not allow for <br /> thst length of etorage, then rigAc turn-in and out proviaiona msy have <br /> to be inatalled in the near future ae directed by the C1ty Tra£Eic �I <br /> Engineer. The acceaa off of Colby and 41at may at some point in the ' <br /> future be phyeically re�tricted to right turn only irregardlesa af the <br />' amount of vehicle atorage at the driverays. i <br /> B. If the retail building were all cne occupant, with eales area over I <br /> 6,000 square feet, aprinklera would be required. ' <br />' 9. The Police Department has the following aeeurity recommendationa: � <br /> a. The perimeter doore ahould be solid core or metal doora with pinned �I <br /> hingee and double cylinder deadbolca rith 1' throw or locking <br /> crashDar when all personnel have vacated. <br /> b. It is beet to inatall non-opening rir.dows which are visible from <br /> well-travpled avenuen. The more buainesa windowe visible to all I <br /> parking lots, the safer the lota are iros aesaulte and thefte. <br /> c. A monitored alarm eyatem should be provided which ia zoned for each <br /> tenant and which hae remote panic buttons, intruaion and fire <br /> seneors. <br />
The URL can be used to link to this page
Your browser does not support the video tag.