My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4402 COLBY AVE 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
4402
>
4402 COLBY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2017 3:16:04 PM
Creation date
1/27/2017 3:15:53 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4402
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CIASED CM WORK ORDERS REPORT <br /> Total Utility Maintenance Management System ' <br /> 02/28/1995 Pa�e 1 <br /> -----•--------------------------------------------------------------------------- <br /> Date Range :O1/09/1989 - 02/21/1995 <br /> CM Work Order Range : 1001091070001 - 8801086100085Pattern :7401196751111 <br /> Item Range :<Blank> - WW22020001 Pattern :* • <br /> Program ALL Function ALL Activity ALL <br /> CM WORK ORDER ID: 7401196751111 Title: CONVERT 4402 COLBY AU� <br /> «DUPLICATE PRINTING OF THIS WORK ORGER» <br /> Item ID: WS3195H042 -- WATER SERVICE <br /> Location ID: -- <br /> Proqram 740 Function 119 Activity G75 <br /> Date Completed: 02/17/1995 <br /> overall Craft: <br /> Zssued: 02/15/1995 Issued by: SKL Assigned to: <br /> out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------- - <br /> UL LMA LIBHING, MAURICE A. 0. 00 4.00 59.12 <br /> WST TDE1 THOMPSON, DWAYNE E. 0.00 4.00 65.40 <br /> ,ti..� . <br /> Total Labor Cost: 124.'I2 <br /> � �i..� �'� Materials: <br /> �'"'��'- ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> ADAP34000347 ADAPTER 3/4" C9T X INSTA-TITE@ 02/17/1995 3 22.44 <br /> ADAP34000647 ADAPTER 3/4" FIP X INSTA-TITE@ 02/17/1995 1 6.99 <br /> BOX000065547 BOX METER CONC W/STEE� LID 02/17/1995 1 25.25 <br /> CCUP34004347 COUPLING 3/4" MIP X COP ELL @ 02/17/1995 2 7.20 ! <br /> METE36089447 METER 5/S" X 3/4" NEPTUNE T-10 02/17/1995 1 26. 14 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. 02/17/1995 4 0.96 <br /> VALV34008648 VALVE METR 3/4" L/W FLARD COP.@ 02/17/1995 2 20.42 <br /> Total Material Cost: 109.40 <br /> Vehibles: <br /> ID De�:�cription � Date Hours Cost <br /> ------------ ------------------------------ -------- ------ <br /> V2146 87 CAEV 1 TON W/HYD. UNIT 02/17/1995 4.00 20.40 <br /> ---------- <br /> Total Vehicle Ccst: 20.40 <br /> i <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> METER# 39594005 <br /> Total cost for work order 7401196751111: 254.52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.