Laserfiche WebLink
CIASED QI iiORR ORDER.S REPORT <br /> Total Utility Maintenance Management System <br /> 08/22/1996 Page 1 <br /> Date Ranqe :O1/09/1989 - 08/22/1996 <br /> CM Work Order Range :1001091070001 - UT1002- - Pattern :7101196750796 <br /> Item Ranqe :<Blank> - WW22020001 Pattern :* <br /> Proqram 1►LL Function ALL Activity ALL <br /> i Ri WORR ORDER ID: 7101196750796 Title REPaIR 4621 COLBY AVE <br /> «DUPLIC.�.TE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS3195J069 -- WATER SERVICE <br /> Location ID: -- <br /> Proqram 710 Function 119 Activity 675 <br /> Date Completed: 08/05/1996 <br /> overall Craft: <br /> Issued: 07/30/1996 Issued by: WMW Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Br. <br /> ![eter Readinq: <br /> Downtime: 0 hours <br /> status: • <br /> Lebor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> UL �t�A I.LLEN, MARK A. 0.00 2.00 30.62 <br /> CF BWK BIELSER, WILLIAM K. 0.00 2.00 39.�6 <br /> UL CSG CAV.�.NAH, SHANE G. 0.00 3.00 37.32 <br /> EO GMJ GREWING, MELVIN J. 0.00 1.00 18.58 <br /> WST WDT WI►LDEN, DAROLD T. 0.00 3.00 61.35 <br /> Total Labor Cost: 187.43 <br /> � Materials: <br /> ID Description Date A Used Cost <br /> -^---------- ------------------------------ -------- -------- ---------- <br /> .�.D1►P34000547 ADAPTER 3/4" MIP X INSTA-TITE@ 07/31/1996 4 30.72 <br /> BOX000065547 BOX METER CONC W/STEEL LID 07/31/1996 1 33.89 <br /> COUP34142747 COUPLING 3/4" CTS COMP X MSPT@ 07/31/1996 2 8•22 <br /> ELIA34101447 ELL 3/4" 90 DEG BR1�SS ^ 07/31/1996 2 2.70 <br /> N/� METER JUMPER (FROtd STOCK) 07/31/1996 1 0.00 <br /> SETT34149747 SETTER COP 5/8" X 3/4" (H7") 07/31/19 1 42. 4 <br /> Total Material Cost: 118 27j <br /> Vehicles: / <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V2117 91 CHEV 1-TON HYD UNIT 3.00 16.80 <br /> V2147 87 CHEV 1.5 YD 2.00 19.68 <br /> V2219 86 GMC 5YD 1.00 10.73 <br /> Total Vehicle Cost: 47.21 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br />