Laserfiche WebLink
3 <br />CLOSED CM WORK ORDERS REPORT <br />� Total Utility Maintenance Manaqement System page 1 <br />' 11/O1/1994 <br />Date Range :10/O1/1992 - 10/27/1994 <br />CM Work Order Range :<Blank> - 8405421080001 pattern :*401196750168 <br />Item Range :<Blank> - W�^122020001 <br />Program ALL Function ALL Activity ALL <br />_______________________________________________________________________________ <br />CM WORK ORDER ID: 7401196750168 Title: CONVERT 5005 COLBY AV� <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS31955075 -- WATER SERVICE <br />Location ID: '- Activity 675 <br />Program 740 Function 119 <br />Date Completed: 10/27/1994 <br />Overall Craft: <br />issued: 10/19/1994 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: o hours <br />Status: <br />Labor: <br />Craft ID <br />UL LMA <br />UL NSO <br />Materials: <br />ID <br />ADAP34000347 <br />ADAP34000647 <br />BOX000056247 <br />COUP34004347 <br />METE36089447 <br />PIPE34060647 <br />VALV34008648 <br />Issued by: SKL Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />LIBBING, MAURICE A. <br />NIELSEN, SCOTT O. <br />Planned Hrs Actual Hrs <br />----------- ------- <br />0.00 3.00 <br />0.00 3.00 <br />Description <br />ADAPTER 3/4" CST X INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" MIP X COP ELL @ <br />METER 5/8" * NO REMOTE READER <br />PIPE 3/4" POLY I.P.S. <br />VALVE METR 3/4" L/W FLARD COP@ <br />Vehicles: <br />Ip Description <br />------------ <br />-------------- <br />V2139 SVC TRUCK CHEV 86 <br />Work Description: <br />----------------------------------- <br />METER� 39594081 <br />Total cost for work order 740119675�168: <br />Total Labor Cost: <br />Date <br />10/27/1994 <br />10/27/1994 <br />10/27/1994 <br />10/27/1994 <br />10/27/1994 <br />10/27/1994 <br />10/27/1994 <br /># Used <br />----- 3 <br />1 <br />1 <br />2 <br />1 <br />8 <br />2 <br />Total Material Cost: <br />Date Hours <br />10/28/1994 3.00 <br />Total Vehicle Cost: <br />Cost <br />41.04 <br />43.68 <br />-----84.72 <br />Cost <br />-----22.08 <br />6.98 <br />12.30 <br />7.14 <br />26.14 <br />1.92 <br />-----18 96 <br />95.52 <br />Cost <br />15.30 <br />15.30 <br />----------------•---------------- <br />195.54 <br />