Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. Connect side sewer per City Stantlard #607. <br />5. Connect side sewer per City Standard #'s 601, 602, 604. <br />6. Connect all rooftop downspouts to the side sewer. <br />7. Connect rooftop downspouts to the drainage system provided for this lot. <br />8. Rooflop runoff must be discharged to a roof downspout infiitration system per City of Everett Storm <br />Manual 3-2.6.2. The approximate size trench is 3.5' wide. 2' deep and 25' long. See attachment for <br />more details. <br />�9. � The contractor must meet with the Public Works Inspector te di�cu,s poteniial drainage routing pricr ;o <br />`— beginning ihe project. Call Randv Allen at 425-339-7403 I/ Cdl-G1iiflindmanat,.�-�'ss� +'�' <br />10. Install erosion control measures as determined by tl:o P�,:bl��c !':'crrs ��,n=_r.ec;cr such as stt t�nce, =traw <br />bales, swales, or erosion blankets. <br />1t Install erosion control measures per City of Everett �t�nd: ris `::r sma'.I �r�o�!s <br />12. Remove erosion control measures upon completion of the project prior to final approval of the �;erm�t. <br />13. All excavated material from toundation, sidewalk and driveways shall be hauled to an approved, <br />permitted site. No wasting of material is allov;ed on this building Ict. <br />14. No dirt, mud, rocks or debris to be lracked onto roadv✓ay. <br />15. No building materials to be stacked on sidev�alklroadc�ay and side,valk/roadway to be kept ctean and <br />open for pedestrian travel. <br />16. Adjust water meter box 1" above sidewalk grade. <br />17. Remove and replace curb, gulter and sidewalk as per City of [verett Standard Plan #'s 305A & 306 on <br />this proposal's irontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />18. Install a Type I concrete driveway per City of Everett Standard #307. <br />19. Pave driveway from the front p�eperty line out to Ihc street pawng. <br />20. Pave to existing paving in alley. <br />21. Contact the Waler Di=_trict (or connecting provisicns for this building's waler and <br />sewer services. <br />22. A catch basin as per City Standard Plan 11402 with a gas trap per Standard Pian #410 is required for the <br />parking area. <br />23. If a sewer pump system is to be instalied, the pressure line must discharge into a private manhole, then <br />grevily flow across the public right-of-way. <br />24. A sprinkler system is required for this building in compliance with the requirements of NFPA Standards <br />13D, <br />y� <br />P��7Can��;ncnu; Re�,�.zc] �.;<: t t <br />