My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5108 COLBY AVE 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
5108
>
5108 COLBY AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 8:56:21 AM
Creation date
1/27/2017 4:03:57 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
5108
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUF3LIC WORKS PERMIT COMMENTS <br />4. Connect sid� sewer per City Standard �601. <br />5. Connect side sewer per City Standard �'s 601, 602. G04. <br />6. Connect all rooHop downspouls to lhe side seti�er. <br />7. Connect rooflop downspouls to ihe drainage syslem provided for this lot. <br />8. Rooitop runoff must be discharged to a rooF do�vnspout infiltration system per City of Everett Stunn <br />Manual 3-2.6.2. The approximale size trench is 3.5' wide, 2' deep and 25' long. See attachmenl for <br />more details. <br />9. The contractor must meet with ihe Public Works Inspector to discuss polential drainage routing pror to <br />beginning the projecl. <br />10. Install erosion control measures as determined by the Pubiic Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankets. <br />11. <br />12. <br />13. <br />�14. % <br />( 15. '. <br />16. <br />77. <br />i a. <br />.-- <br />i19. i <br />20. <br />21. <br />22. <br />23. <br />Install erosion conirol measures per Ciry of Everett Standards for small parcels <br />Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />All excavaled materiai from foundation, sidewalk and driveways shall be hauled to an approved, <br />permitted site. No wasting of material is allowed on ihis building lot. <br />No dirt, mud, rocks or debris to be tracked onto roadway:� <br />,�)Cl�=y Al[�y <br />No building materials to be siacked on sidetirelks and sidewalks to be kept clean and open for <br />-ryedestHen travel. <br />�cfl�cic <br />Adjust water meter box 1" above sidewalk grade. <br />Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A 8 30ti on <br />this proposal's fronlage as directed by lhe Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area musl be replaced). <br />Instali a Type I concrete driveway per City of Everett Standard #307. <br />��.ic <br />Pave driveway irom the fcuA property line out to the � paving. <br />Contact 1he _ <br />sewer services. <br />Waler District for connecling provisions for this building's water and <br />A catch basin as per Ciry Standard Plan it402 with a gas lrap per Standard Plan #410 is required for the <br />parking area. <br />IF a sewer pump system is to be installed, lhe pressure line musl discharge inio a private manhole, then <br />gravity ilow across ihe public right-of-way. <br />A sprinkler syslem is required for this building in compliance with the requirements of NFDA Standards <br />13D. <br />FOR PUBLIC WORKS INSPECTION, CALL RANDY P.7 425-339-7403 / CLIFF AT 425-339-7404 <br />P„cv,��ne�is � <br />';�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.