Laserfiche WebLink
October 25, 1979 <br />Donald L. Berkey, P.E. <br />Chief Distribution Engineer <br />Snohomish County P.U.D. <br />P. O. Box 1107 <br />Everett, WA 98206 <br />ATTN: Corrine White <br />Subject: P.U.D.87rmit 1/ 79/23 <br />, <br />Ine Evergreen <br />CITY OF <br />everett <br />CITY NAIL' 259-0755 <br />IYCe CTT. WASIIINGTOf1 <br />•eaol <br />Dear Don: <br />Your application for a permit ti55th be Colby, has been a portion of approved nground eOctobersystem <br />within the public right-of-way at <br />25, 1979 as per plan (W.O. 980651). <br />The subject permit approval is based on the agreement that all work will be <br />carried out in accordance with the City of Everett standards and American <br />Public Works Association par. <br />.tions for and 3.06). trench Allhardc surface street cr ssings <br />lling <br />(Reference: Section p <br />shall be by jacking, boring or other prepproved construction methods. <br />It will be the obligation of the utility company to bear any costs ilrtl may he <br />incurred intesting and confirming the requirement. <br />Thy restoration of all landscaping and repairs will be comparable will, its Original <br />condition and to the satisfaction of the City Engineer or his appointed <br />representative. <br />It will be your responsibility to contact the City E-ngincu ing Department (phone <br />259-8811) immediately prior to starting construction. <br />Sincerely, <br />HUGH WARREN, P.E. <br />Director of Public Works <br />i <br />By: Jeff Kerwin <br />Utility inspector <br />Hw!JK:jcl <br />