Laserfiche WebLink
EVERETT WATER DEPARTMENT <br />3200 CEDAR STREET <br />EVERETT, WASHINGTON <br />COST ESTIMATE SHEET <br />TYPE OF INSTALLATION <br />LOCATION <br />REQUESTED BY <br />DATE OF REQUEST <br />SIZE <br />ESTIMATED COST <br />New fire hydrant <br />Approximately 5301 Colby <br />Larry Callahan <br />3-5-79 <br />6" <br />$2, 603.27 <br />(Whenever the estimated cost is not sufficient to cover the total <br />expense for labor, materials, equipment rental and administration, <br />the deficit shall be charged to the properly for which such installa- <br />tion was made and the owner thereof, and provided further, that any <br />excess payment shall be returned to the person applying for the in- <br />stallation.) <br />ESTLATED COST ITEMIZED AS FOLLOWS: <br />Labor <br />$ 655.80 <br />Material. <br />1,279. 95 <br />Equipment rental <br />297. 82 <br />Street restoration <br />50.00 <br />Administration and supervision <br />319.70 <br />Total estimated cost of project <br />$ 2,603.27 <br />cc: Fred Oehlert <br />Bud Krom <br />Don Wahl <br />Don Weitkamp <br />X. l - <br />Donald Weitkamp. Supervisor ater <br />