Laserfiche WebLink
('l rn up,•n spaces or car park areas _ <br />The design uterm should not exceed a depth of three (3) inches. <br />to case of a blockage at tha outlet, the design should provide for <br />overland flow (preferably to a City street) when the depth increases <br />to six (6) inches. e <br />(3) Specially constructed detention ponds. When the design water depth <br />for such ponds exceeds 3 feet or when side slopes for rnrch ponds are <br />steeper than three horizontal to one vertical, the pond should be <br />fenced for safety reasons. The side slopes should be stabilized for <br />anti -erosion purposes. Berm construction should conform to sound <br />engineering practices for design and construction drrd should be <br />stable under all conditions, at all times. The width at, top of berm <br />uhould be not less than 6 fast. <br />MAINTLNANCL OF DLVnNTION STORAGE FACILITIES <br />Maintenance of detention storage facilities located on privately owned <br />property !;hall be the respunsibili.ty of the property owner. <br />DESIGN OF OO'I'LET FIPI", <br />The outlet pipe from the outlet control of the detention facility must have <br />adequate capacity to cater for maximum inflow. Under normal circumstances <br />the outlet pipe capacity would equal the runoff from the contributing <br />catchment area with post development runoff coefficient. <br />'flee Ripe size may be selected from a suitable nomograph or m.ry be calculated <br />mathematically. <br />