Laserfiche WebLink
TO BE COMPLETED BY kPPL:CANT <br />c. What generai tvp= of soils are fuund on the site (for example, clay, sand. gravel. peat. <br />muck)? If ou know the classification of aencultural soils. specify them and note any prime <br />farmland. <br />"ix- sandy loam <br />d. Are there surface indications or history of unstable soils in the immediate vicinity? If so. <br />describe. <br />VO <br />Describe the purpose, type, and approximate quantities of any filling or grading pro. <br />posed. Indicate source of fill. <br />'Zone needed <br />f. Could eroson occur as a result of clearing, construction, or use? If so, generally describe. <br />No <br />S. About what percent of the site will be covered with impervious surfaces after project <br />construction (for example, asphalt or buildings)? <br />W Approzinately <br />h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: <br />Proper drainage of roofs, walks, and drives. <br />2. Air <br />a. What types of emissions to the air would result from the proposal (i.e.. dust, automobile, <br />odors, industrial wood smoke) during construction and when the project is completed? If <br />any, generally describe and give approximate quantities if known. <br />Normal construction Oust etc. Very minimal <br />b. Are there anv off -site sources of emissions or odor that may affect your proposal? If so, <br />generally describe. <br />No <br />c. Proposed measures to reduce or control emissions or other impacts to air, if any: <br />Proper disposal of all material. <br />I <br />EVALUATION FOR <br />AGENCY USE ONLY <br />C C5 b90Ps rAkCg{e. <br />/�GiAvY�ztii - Urba.t <br />Z tv 8 PeIv.A 4- <br />5 loPe� <br />