My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5613 COLBY AVE 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
5613
>
5613 COLBY AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 11:53:03 AM
Creation date
1/27/2017 4:21:26 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
5613
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO BE COMPLETED BY kPPL:CANT <br />c. What generai tvp= of soils are fuund on the site (for example, clay, sand. gravel. peat. <br />muck)? If ou know the classification of aencultural soils. specify them and note any prime <br />farmland. <br />"ix- sandy loam <br />d. Are there surface indications or history of unstable soils in the immediate vicinity? If so. <br />describe. <br />VO <br />Describe the purpose, type, and approximate quantities of any filling or grading pro. <br />posed. Indicate source of fill. <br />'Zone needed <br />f. Could eroson occur as a result of clearing, construction, or use? If so, generally describe. <br />No <br />S. About what percent of the site will be covered with impervious surfaces after project <br />construction (for example, asphalt or buildings)? <br />W Approzinately <br />h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: <br />Proper drainage of roofs, walks, and drives. <br />2. Air <br />a. What types of emissions to the air would result from the proposal (i.e.. dust, automobile, <br />odors, industrial wood smoke) during construction and when the project is completed? If <br />any, generally describe and give approximate quantities if known. <br />Normal construction Oust etc. Very minimal <br />b. Are there anv off -site sources of emissions or odor that may affect your proposal? If so, <br />generally describe. <br />No <br />c. Proposed measures to reduce or control emissions or other impacts to air, if any: <br />Proper disposal of all material. <br />I <br />EVALUATION FOR <br />AGENCY USE ONLY <br />C C5 b90Ps rAkCg{e. <br />/�GiAvY�ztii - Urba.t <br />Z tv 8 PeIv.A 4- <br />5 loPe� <br />
The URL can be used to link to this page
Your browser does not support the video tag.