Laserfiche WebLink
CLOSED CM WORR ORDERS REPORT <br />Total utility Maintenance Management System <br />O5/12/1995 Page 1 <br />-------------------------------------------------------------------------------- <br />Date Range :01/09/1989 - OS/03/1995 <br />CM Work Order Range :1001091070001 - 8801086100085Pattern :7401196751238 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />---------------------------------------- <br />---------------------------------------- <br />CM WORK ORDER ID: 7401196751238 Title: CONVERT 7014 COLBY F1+'� <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />item ID: W50785H032 -- WATER SERVICE <br />Location ID: -- <br />Program 740 Function .119 <br />Date Completed: O5/03/1995 <br />Overall Craft: <br />Issued: 04/25/1995 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />CraFt ID <br />UL SSJ <br />WST WDT <br />Materials: <br />ID <br />ADAP34000547 <br />BOX000056247 <br />CGUP34003347 <br />ELL034104247 <br />METE36089447 <br />NIPP34131947 <br />PIPE34060647 <br />SETT34033647 <br />Activity 675 <br />Issued by: JSM Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name Planned Hrs Actual Hrs <br />------------------------------ ----------- ---------- <br />SMITH, STEVE J. 0.00 3.00 <br />WALDEN, DAROLD T. 0.00 3.00 <br />Total Labor Cost: <br />Description <br />ADAPTF.R 3/4" MIP X II�STA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" COMPRESSION @ <br />ELL 3/4" STREET BRASS ' <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />NIPPLE 3/4" X 4" BRASS ' <br />PIPE 3/4" POLY I.P.S. <br />SETTER COP 5/8" X 3/4�' LGTH15" <br />Vehicles: <br />ID Description <br />------------ ----------- <br />V2117 91 CHEV 1-T <br />Work Description: <br />------------------------- <br />METERn 40304298 <br />Date <br />05/03/1995 <br />OS/03/1995 <br />05/03/1995 <br />O5/03/1995 <br />05/03/1995 <br />O5/03/1995 <br />05/03/1995 <br />O5/03/1995 <br />� Used <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Total Material Cost: <br />Hours Cost <br />------------------ ------ ---------- <br />N HYD UNIT 3.00 1G.80 <br />Total Vehicle Cost: 16.80 <br />----------------------- <br />Cost <br />45.09 <br />60.24 <br />105.33 <br />Cost <br />15.18 <br />12.94 <br />7.19 <br />1.68 <br />27.90 <br />1.67 <br />0.24 <br />40.96 <br />107.76 <br />. <br />