My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7015 COLBY AVE 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
7015
>
7015 COLBY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2017 1:04:28 PM
Creation date
1/27/2017 4:55:45 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
7015
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• , ;�.� <br />COST ESTIMATE SHEET <br />Receipt a /3��aS <br />i `iJ�� 'l;� i�� �i�i <br />J - . � t <br />ApR 2 4 ?998 <br />._ _ .. ... .. ........__.... <br />CITY OF EVE9ETT <br />CnyIf120f1f1QIFC:11%J S2iVILES <br />X Cost of Work Order 2,0�.� <br />Cosrof Service O�der <br />Contacc Person Marty Loberg <br />Public Works Departmmt <br />Utilities Division, 3200 Cedar Stmt <br />Everett, WashingWn 98201 <br />(42� 257-8800 <br />Date Paid S //—,Q,� <br />Work Order N <br />Senrice Order fi� <br />Telephone # 360-308-0753 <br />Reqnested By Gordon Witeher Date of Request 423-98 <br />Propecty Owner (name) Northem Reign Div <br />Charge Cost to (name if different than owner) _ Same <br />Address PO Box 1958 Ciry Marysville Zip 98270 <br />Installation Location 7015 Colby Everett 98201 <br />Installa�on type/descripcion/size%cc. Expose 12", tap 2" 10' (±) poly and restore road 6 sidewalk arca. <br />� The following estimate is bued upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />❑ The following estimate is based upon the Street Division work group providing all labor, equipment, materials <br />and restoration to properry. <br />Please noHfv the Citv of Everett Utilities Division 10 workin¢ davs in advance of reauired installation date <br />to allow for schedulina and parts arocurement <br />W6mever the estimated cost is not sutiicient to cover the total expease for labor, material, equipment rental and <br />administrative costs, the de6cit shall be charged to the property for whic6 such iastallstion was made and the owner <br />thereu[, and provided further, that any e�ccess payment sMall be returned to the person applying for the iastallatioa <br />*Deposit must be paid prior w ordcring parts or schedu5ng work. <br />Labor & Benefits <br />Material <br />Equipment Rental <br />Surface Restoration <br />TOTAL <br />864.00 <br />648.00 <br />494.00 <br />• $ 2,006.00 <br />cc: BIdg.PetmitCenter <br />Clair Olivers <br />Tom'It�ctfocd <br />Kirk Hrooks <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Paul McKee ' <br />Gerty Cnim <br />Alan Locke <br />Prepared by: John Garza Dace Est. - <br />Accepted by: Pcepared: Representing: <br />r 423-98 <br />ESTI�fATE 600D FOR 6 MONTHS <br />con�cro: ic�u�u�M+rz.nvm <br />
The URL can be used to link to this page
Your browser does not support the video tag.