Laserfiche WebLink
everett INSPECTION REPORT <br /> � �� �Y'�'.` 1 <br /> Address <br /> Contractor <br /> = � � <br /> Owner <br /> Date ��(� <br /> TYPE/�OF INSPECTION REQUESTED <br /> �BLDG: Pmt. No. �-��� MECH: Pmt. No. � <br /> ❑ ELEC: Pmt. No. ❑ PLBG: Pmt No. � <br /> ❑Temp.Elect. ❑ Framing ❑Gas Piping <br /> ❑ ing ❑Drywall, Nailing ❑Consultation <br /> Foundation ❑Shear Nailing ❑Groundwerk <br /> ❑ Ductwork ❑Grid ❑Struct.Slab <br /> � ❑Wood Stove ❑ Rough-In ��^ � � <br /> ❑ Masonry ❑Service <br /> APPROVAL ❑ PARTIAL APPROVAL <br /> VIOLATIO ❑ CORRECTION REQUIRED <br /> � � �G ons listed below MUST BE MADE before work can be approved. <br /> . ❑ Please contact inspector and arrange for appointment. <br /> � ❑Was not able to peAorm inspectioa � <br /> ❑CALL 259•8810 FOR REINSPECTION—24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> Inspector Date �j% / ' <br />