Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 3 <br /> PROJECT TITLE: <br /> XX Consent COUNCIL BILL-# <br /> Advertisement for Bids for the Action Originating Department Public Works <br /> Repair of Crosstown Pipe Lining First Reading Contact Person Tim Marks <br /> Project. Second Reading Phone Number 257-8872 <br /> Third Reading FOR AGENDA OF 3-17-04 <br /> Public Hearing <br /> Initialed by: <br /> Department He pror <br /> CAA b il�! <br /> Council Presiden / / <br /> Location Preceding Action Attachments Department(s)Approval <br /> 25th street between Design contract with None <br /> Harrison and West CH2M HILL <br /> Marine View Drive <br /> Council approval of this agenda it—m authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $400 Account Number(s): UT-2880 <br /> Amount Budgeted $2,500,000 <br /> Additional Required $None <br /> DETAILED SUMMARY STATEMENT: <br /> Approximately 8000 feet of the 40 inch diameter Sultan River Supply Line was to be converted over to use <br /> for pumping effluent from the Water Pollution Control Facility to the Kimberly Clark Deep Water Outfall <br /> Pipe. During a detailed video inspection of the line during construction of the Effluent Transfer Project it <br /> was found that the mortar liner in the pipe was damaged. Before this line can be placed into service it must <br /> be restored. CH2M HILL is preparing Plans and Specification needed to solicit bids to restore the liner of <br /> this pipe to a new condition. These documents will be ready to bid during the week of March 22. <br /> RECOMMENDATION (Exact action requested of Council): Authorize to Advertise a Request <br /> for Bid Proposals for Repair of Crosstown Pipe Lining Project. <br /> 4 <br />