Laserfiche WebLink
6 <br /> • S. 3`d Avenue, Cascade View & I-5 NB On-Ramp Profile (6 sheets) - No <br /> revisions anticipated. <br /> • Access Road Profile - Revise 2 of 3 existing sheets. <br /> • Drainage & Utility Plan - Revise 1 of 9 existing sheets. <br /> • Ditch Location Plan —Revise 1 sheet. <br /> • Pump Station Plan (1 sheet) —No revisions anticipated. <br /> ■ Drainage Details (4 sheets) - No revisions anticipated. <br /> • Drainage & Utility Plan —Revise 1 sheet. <br /> • Landfill Gas Collection System Plans 1 and 1A —Revise 2 sheets. <br /> • Landfill Gas Header Profiles 1 - Revise 1 sheet. <br /> • Landfill Gas Header Profiles 2 - Revise 1 sheet. <br /> • Landfill Gas Collection System Sections and Details 6—Add 1 new sheet. <br /> • 41St Street Signal Plans & Details - Revise 1 of 14 existing sheets. <br /> • Illumination Plan - Revise 1 of 3 existing sheets. <br /> • Channelization and Signing Plan - Revise 2 of 7 existing sheets (CH2, CH6). <br /> ■ Landscape Plans: Revise 2 of 5 existing sheets. <br /> 7. Quantities and Estimate of Probable Construction Cost <br /> a. Revise project quantities and update estimate of probable construction cost that <br /> incorporate the above modifications and reflect updated unit costs. <br /> 8. Technical Specifications <br /> a. Revise project specifications as required to incorporate additional improvements. <br /> 9. Project management and administration <br /> a. Set up subconsultant agreements and filing. <br /> b. Project administration (assume project duration of a maximum of 4 months — <br /> through May 2004): Monthly invoicing and status reports. <br /> c. Project coordination will be continue by phone, email, fax, and meetings. <br /> Allowance for up to 8 meetings with the City and internal to the team: <br /> • Kickoff meeting <br /> • Weekly intermediate review and coordination meeting <br /> • Review meeting following 95% submittal, including review of <br /> specifications. <br /> 29 <br /> 41s'Street Overcrossing Page 4 <br /> Amendment#11, Attachment A: Scope of Work March 25,2004 <br />