Laserfiche WebLink
6 ATTACHMENT B <br /> CONSULTANT FEE DETERMINATION - SUMMARY SHEET <br /> HDR Engineering, Inc. <br /> 41st Street Overcrossing Project, City of Everett <br /> Phase 3B: Final Roadway Contract Documents <br /> Amendment# 11 - 41st Street Extension <br /> (Cost Plus Fixed Fee) <br /> Classification Hourly Rate Total Hrs Cost <br /> Project Principal $ 65.50 0 $ - <br /> Project Manager $ 47.10 100 $ 4,710 <br /> Senior Civil (Landfill) Engineer $ 48.76 47 $ 2,292 <br /> Senior Civil (Roadway) Engineer $ 51.44 0 $ - <br /> Civil Design Engineer $ 29.81 72 $ 2,146 <br /> Electrical Engineer $ 44.62 6 $ 268 <br /> CADD Technician $ 29.00 52 $ 1,508 <br /> Admin/WP $ 19.00 10 $ 190 <br /> Project Controller $ 30.84 14 $ 432 <br /> 301 <br /> Total Direct Salary Cost at Year 2004 Direct Labor Rates: $ 11,546 <br /> Overhead: 163.09% $ 18,830 <br /> Fixed Fee: 30.00% $ 3,464 <br /> Subtotal DSC+OH + Fee: $ 33,840 <br /> Direct Expenses (see attached) <br /> Reproduction $ 650 <br /> Travel (mileage @$0.365 per mile) $ 158 <br /> Computers $ 1,385 <br /> Communications: Phone, Fax $ 360 <br /> Courier, Postage, Photos, Miscellaneous $ 265 <br /> Subtotal: $ 2,818 <br /> HDR TOTAL: $ 36,658 <br /> Subconsultants: <br /> Perteet Engineering, Inc. $ 53,707 <br /> HWA Geosciences, Inc. $ 8,401 <br /> Worthy&Associates, Inc. $ 2,381 <br /> Landmarc Technologies, Inc. $ - <br /> $ 64,489 <br /> GRAND TOTAL: $ 101,147 <br /> i 31 <br /> Date: March 15, 2004 Prepared by: Joyce Lem <br /> File: All 03-15-04 jml.xls HDR LAG Page 1 Printed 3/25/2004 <br />