Laserfiche WebLink
} 11_ <br /> SECTION I: APPLICANT INFORMATION <br /> Construction Loan ® or Pre-Construction Loan ❑ (Check only one) <br /> Borrower: City of Everett <br /> Population within Jurisdiction: I 500,000 I Percent affected by this project: --- 100%J <br /> J i <br /> Federal Tax ID #: i 1 - 0 0 1 2 ¶ 81 City: Everett <br /> ----------- --- <br /> State: L WA Zip Code: 1-"-- 1 2 0 1 - 4 5 1 61 <br /> Project Title: I Clearwell No. 2 <br /> ----- ---- ----- <br /> Project Description: r Design & construct a second 5 million gallon clearwell at the Everett Water Filtration Plant.] <br /> Attach Pro'ect Map (required) --- <br /> County: Snohomish <br /> ---- ------ ---- <br /> Congressional District: 25-6. Legislative District(s): 38th 1 <br /> Primary system affected by ❑Bridge ❑Road ® Domestic Water <br /> this project. (Check only - ---- ----- --I-- -- --- - - - --- -i <br /> one) ❑Storm Sewer ❑Sanitary Sewer ❑Solid Waste/Recycling <br /> Contact Person: Madelaine Yun <br /> Street Address: F3200 Cedar Street Everett WA 98201 <br /> Mailing Address: 3200 Cedar Street Everett WA 98201 <br /> Telephone: r(425) 257-7229 1FAX: I (425) 257-8886 <br /> Email Address: J <br /> Did a consultant prepare this application: El YES I ® NO <br /> If"YES", Name: 1 Telephone: <br /> Total Project Cost: ( $ 107000,000 . <br /> PWTF Loan Request: $ 8,500,000 <br /> Useful life of the improvement is: 25 Years. <br /> How many years have you owned/operated this system? 20 Years <br /> 81. <br />