My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/04/07 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/04/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 10:37:58 AM
Creation date
1/30/2017 10:37:27 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/7/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. t <br /> SECTION I: APPLICANT INFORMATION - <br /> Construction Loan N or Pre-Construction Loan 0 (Clieck only one) <br /> 1 2 _ <br /> Borrower: 1 City of Everett <br /> 1 <br /> Population within Jurisdiction: 1 500,000 Percent affected by this project: . 100% <br /> Federal Tax ID #: U1 - r 6[ 0 0 fr 21 4 8] City: Everett <br /> State: r WA I Zip Code: 9 8 2 0 1 - 4 5 1 6 <br /> I <br /> Project Title: L Everett Treatment Plant Upgrade <br /> Project Description: Construct Wastewater Treatment Plant improvements <br /> 1 <br /> Attach Proriect Map ( equired) <br /> County: i Snohomish –1 <br /> Congressional District: : 2nd Legislative District(s): I 38th <br /> 1 <br /> Primary system affected by ,_.,r1Bridge 1 El Road 0 Domestic Water 1 <br /> i <br /> this project. (Check only <br /> one) OStorm Sewer R-Sanitary Sewer ElSolid Waste/Recycling <br /> Contact Person: L Madelaine Yun <br /> .1 <br /> Street Address: [ 3200 Cedar Street Everett WA 98201 <br /> ] <br /> Mailing Address: 1 3200 Cedar Street Everett WA 98201 <br /> j <br /> Telephone: [ (425) 257-7229 ]FAX: (425) 257-8886 <br /> ] <br /> Email Address: r <br /> Did a consultant prepare this application: 1 DYES 1—EFT\10 1 <br /> , 1 <br /> If"YES", Name: i Telephone: IL _j -------------------1 <br /> Total Project Cost: $25,800,000 1 <br /> PWTF Loan Request: $10,000,000 <br /> Useful life of the improvement is: 50 li Years. <br /> How many years have you owned/operated this system? 45 Years <br /> • 85 <br /> .., <br />
The URL can be used to link to this page
Your browser does not support the video tag.