My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/04/21 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/04/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 11:07:52 AM
Creation date
1/30/2017 11:07:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/21/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Authorize the Mayor to sign Consent COUNCIL BILL# <br /> Amendment No. 1 to the Professional X Action Originating Department Facilities <br /> Services Agreement between the City First Reading Contact Person Don Jensen <br /> of Everett and Botesch, Nash & Hall Second Reading Phone Number 257-8863 <br /> Architects Third Reading FOR AGENDA OF 4/21/04 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President 40,17 <br /> Location Preceding Action Attachments Department(s) Approval <br /> Everpark Garage None Original Professional Legal <br /> Service Agreement & <br /> Amendment No. 1 <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ -0- Account Number(s): <br /> Amount Budgeted $ -0- <br /> Additional Required $ -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The City of Everett has an agreement with Botesch, Nash & Hall to hire Elevator Consulting Services, <br /> Inc. to prepare a design and specifications to modernize the Everpark Garage elevator and provide on- <br /> site construction inspection services. A contract has recently been signed with Vertical Transportation <br /> Services to modernize the elevator through the Small Works contract process. The construction is <br /> expected to take 150 calendar days to complete. TheProfessionalServices Agreement completion date <br /> needs to be extended from October 10, 2003 to August 30, 2004 to cover on-site construction inspection <br /> services provided by Elevator Consulting Services, Inc. throughout the duration of the project. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement between the City of <br /> Everett and Botesch,Nash &Hall Architects, P.S. changing the completion date to August 30, 2004. <br /> 1J <br />
The URL can be used to link to this page
Your browser does not support the video tag.