Laserfiche WebLink
Washington Slate Department of Transportation Page 9 Six-year Transportation Improvement Program <br /> Agency Everett SIX-YEAR TRANSPORTATION IMPROVEMENT PLAN From 2005 to 2010 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only_ <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> Func- D. Street/County Road Name or Number Improve Phase Federal Federal State 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2005) (2006) (2007) 6th _Type (MM/YY) <br /> 1 2 3 4 5 e 7 8 9 10 11 12 13 14 15 18 17 18 19 20 21 <br /> 19 10 2 phases in project 32 P 0.3 C PE 6/1/2004 25 25 25 175 <br /> Local Port of Everett is Lead Agency 0 CN 6/1/2005 175 175 <br /> Non- Port of Everett Public Access Walkway <br /> Motorized Port of Everett South Terminal-sewer easement <br /> Bond Street to Pigeon Creek#1 <br /> Construct bike-ped trail - Totals 200 200 25 175 <br /> 19 11 3 phases in project 32 P 0.1 C PE 1/1/2006 50 50 50 <br /> Local O RW 7/1/2007 25 25 25 <br /> Non- Pigeon Creek No.1/BNSF Crossing CN 4/12008 350 350 350 <br /> Motorized Port of Everett Public Access Walkway,Pigeon Creek <br /> Pigeon Creek No.1 Road/BNSF Railway <br /> Construct bike-ped bridge or undercrossinq Totals_ 425 425 50 25 350 <br /> 19 12 3 phases in project 31 S C PE 4/1/2005 100 100 100 100 100 300 CE <br /> Local P Yes <br /> Non- Shoreline Access Improvements T CN 7/1/2006 900 900 900 900 900 2,700 <br /> Motorized City of Everett waterfront 0 <br /> Snohomish River/Puget Sound,various locations <br /> Design,construct bicycle-ped paths along waterfront _ Totals 1,000 1,000 1,000 1,000 1,000 2,700 <br /> 19 13 2 phases in project 32,8 S,P 0.2 0 PE 4/1/2002 STP(E) 149 254 403 EA <br /> Local PE 4/1/2007 CMAQ 318 1,000 1,318 1,319 No <br /> Non- 1-5/Snohomish River Bicycle-Ped Bridge CN 4/1/2009 IAC 250 2,000 2250 2,250 <br /> Motorized Interstate5 CN 4/1/2009 DISCR. 3,000 ALEA 783 1,246 5,029 5,029 <br /> East Marine View Drive to Langus Riv'ft.Park <br /> Design,cosntruct bike-ped bridge over Snohomish River Totals _ 3467 1,033 4,500 9,000 1,319 7,279 <br /> 19 14 3 phases in project 32 P 00 P PE 5/1/2005 120 120 100 20 30 60 <br /> Local 0 RW <br /> Non- Everett Non-Motorized Transportation Projects CN 9/1/2006 1,180 1180 280 270 540 <br /> Motorized Various locations within City Limits'(see below) <br /> Various Locations to Various Locations <br /> Design-construct ped&Bike Paths&Bike lanes Totals 1300 1300 100 300 300 600 <br /> *Candidate non-motorized improvements include Norton Avenue,Olympic Drive,Smith Avenue,Wall Street, <br /> Bond Street,Lowell River Road,36th Street,Sharon Drive,Friday Avenue,Lowell Road-Lenora Street,90th Street SW, <br /> 93rd Street SW,Dom Avenue-92nd Street SE,7th Avenue SE,3rd Avenue SE,Dakota Way,Hollowdale Place, <br /> Cady Road,Fleming Street,75th Street,100th Street SW,and various shoreline public access projects <br />