My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5492
>
Resolutions
>
Resolution 5492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2017 10:55:36 AM
Creation date
1/31/2017 10:55:34 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5492
Date
6/16/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sprinkler Permit Fees Fee <br /> Size of System: <br /> Fewer than 51 sprinklers $40.00 <br /> 51 to 100 sprinklers $40.00 + .60/hd in excess of 50 <br /> Over 100 sprinklers $70.00+ .50/hd in excess of 100 <br /> Plan Review 50% of Sprinkler Permit Fee <br /> Repair Permit $20.00 <br /> Fewer than 21 heads in T.I. <br /> (NOT new construction) $40.00/No Plan Review <br /> C. Inspection Fees, Plan Review and Other Related Fees <br /> Permit Issuance Fee <br /> 1. Inspections outside of normal business $75.00/hr <br /> hours (minimum charge 2 hours) <br /> 2. Re-inspection fees assessed under $50.00 for each re-inspection <br /> Administrative Code <br /> 3. Special investigation fee assessed• under An amount equal to the <br /> the Construction Administrative Code building permit __ <br /> 4. Inspection for which no fee is specifically $50.00 minimum <br /> indicated <br /> 5. Building plan review fee An amount equal to 65% of <br /> the determined building <br /> permit fee. <br /> 6. Plumbing permit plan review fee An amount equal to 65% of <br /> the determined plumbing <br /> permit fee. <br /> 7. Mechanical permit plan review fee An amount equal to 25% of <br /> the determined mechanical <br /> permit fee. <br /> 8. Additional plan review required by $50.00hr <br /> changes, addition or revisions to plans or <br /> for a third plan review <br /> 9. Basic Plan Program: plan review fee An amount equal to 65% of <br /> charged to register the initial plan the determined building <br /> permit fee for the initial <br /> basic plan. <br /> 10. Basic Plan Program: each option An amount equal to 65% of <br /> submitted that produces a different the determined building <br /> building configuration. permit fee for each different <br /> building configuration. <br /> 3 <br /> DEM/RESOLUTIONS/BUILDING CODES(TYLER) <br />
The URL can be used to link to this page
Your browser does not support the video tag.