Laserfiche WebLink
7 <br /> CITY OF EVERETT <br /> DESIGN OF NEW SODIUM HYPOCHLORITE FACILITIES FOR OF THE EVERETT WATER <br /> FILTRATION PLANT(EWFP) <br /> EXHIBIT A <br /> SCOPE OF WORK <br /> Planned engineering services to be performed in accordance with Article 1 of the Agreement comprise and <br /> are limited to those specifically set forth in this exhibit.These services are for the final design,bid assistance, <br /> and construction management assistance work associated with the Project,as described herein. The Scope of <br /> Work for this Project assumes that all construction activities will occur on the existing E\VFP site. <br /> The specific elements of the work in this Agreement are subdivided into the following tasks: <br /> Task Title <br /> Task 501 Prepare Existing Base Mapping <br /> Task 502 Geotechnical Investigations <br /> Task 511 Civil Design <br /> Task 513 Structural Design <br /> Task 514 Mechanical Design <br /> Task 515 Electrical Design <br /> Task 516 Instrumentation and Controls Design <br /> Task 530 Construction Cost Estimate and Construction Schedule <br /> Task 540 Quality Control and Assurance <br /> Task 550 Document Preparation and Bid Assistance <br /> Task 610 Submittal Review and Office Engineering <br /> Task 620 Change Order Preparation <br /> Task 640 On-Site Field Services <br /> Task 660 Operations and Maintenance Manual <br /> Task 670 Startup Services <br /> Task 680 As-Built Documentation <br /> Task 710. Project Management <br /> Task 720. Unanticipated Services <br /> Page 1 <br /> S:\ CC1e1i\GP-31°3-WFP Chlorine E dg\ENTP 1:7aOC1 Scope of Work A3.doc <br /> 42 <br />