My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/05/05 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/05/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 8:31:40 AM
Creation date
2/1/2017 8:30:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/5/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> Task 610. Submittal Review and RFI Response <br /> Objective. To insure that the facilities proposed by the Contractor will fulfill the requirements of the <br /> contract. This task will also support the Construction Manager by conducting miscellaneous office <br /> engineering services during construction. <br /> Approach. One reproducible original plus four copies of a complete submittal package will be received by <br /> the Consultant from the Construction Manager. The Consultant will receive and review complete submittals <br /> for contract compliance and return comments to the Construction Manager within 21 calendar days. In <br /> order to maintain within the budget allocated for this task, it is imperative that complete submittals be <br /> provided; the Consultant reserves the right to return incomplete submittal packages to the Construction <br /> Manager without review of content. A complete submittal package will include all of the information listed <br /> in the contract documents with single unit responsibility (e.g. a particular piece of equipment or system) <br /> which may include materials, shop drawings,wiring diagrams, design and performance criteria, calculations, <br /> mitigation plans,outage plans,and product data. <br /> The Consultant shall assemble two separate submittal lists and deliver these lists to the Construction <br /> Manager. One submittal list will show each Project Manual submittal that requires review, comment, and <br /> approval by the Engineer. The second submittal list will show all submittals that are considered product data <br /> and are for information purposes only. One copy of each list shall also be transmitted to the City. <br /> A normal part of submittal review herein includes some minor effort in reviewing submittals that deviate <br /> from the contract documents. Excessive review of Contractor proposals for alternate equipment and <br /> materials, equipment proposals not in compliance with the specifications, and cost savings proposals by the <br /> Contractor is to be at the Contractor's expense. Otherwise, this additional work shall be in accordance with <br /> the Agreement. <br /> The Consultant will also respond to requests for information (RFIs). Unless otherwise directed by the City, <br /> all RFIs shall be submitted in writing and shall be sent directly to the Consultant by the Contractor. The <br /> Consultant shall immediately send one copy of all RFIs to the City. The Consultant shall prepare a written <br /> response to'all RHs. The Consultant shall send one copy of the written response to the Contractor, one <br /> copy to the City,and shall retain one copy for their files. Written responses shall be prepared and distributed <br /> within 15 days after receipt from the Contractor. The budget allocated for this task assumes a limited labor <br /> effort,as shown in Exhibit B. <br /> Product. The consultant will return comments for each submittal or RFI to the Construction Manager. The <br /> consultant will maintain a submittal and RFI log reflecting only the submittals that the Construction Manager <br /> has chosen to give to the Consultant for review. The Construction Manager is expected to maintain the <br /> official project submittal and RFI log for all submittals. The Consultant shall submit one list of contract <br /> submittals that require review and comment and one list of contract submittals that are considered product <br /> data. <br /> City Responsibilities. The City shall review all submittals that require the Engineer's approval upon receipt <br /> from the Consultant. The City shall inform the Consultant in writing of any specific comments that the City <br /> wants incorporated into the submittal mark-up within 7 calendar days upon receipt from the Consultant.The <br /> City shall review all RFIs immediately upon receipt from the Consultant. The City shall inform the <br /> Page 18 <br /> S:\JMcC1e111UP-3193-WFP Chlorine BIdg1EWFP NaOC1 Scope of Work R3.doc <br /> 59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.