My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/05/05 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/05/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 8:31:40 AM
Creation date
2/1/2017 8:30:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/5/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> Task 680. As-Built Documentation <br /> Objective. To provide as-built documentation for the project. <br /> Approach. The construction drawing sets for the project will be updated by the Construction Contractor to <br /> reflect the as-built facilities. These documents will be transmitted to the Consultant immediately after <br /> construction. The Consultant will incorporate the as-built information and create an electronic set of master <br /> as-builts for the project. <br /> Activities/Products. The Consultant will assemble a set of as-built drawings for the project. Products for <br /> this task include submission of one complete and reproducible full-size drawing set for the as-built facilities, <br /> and an electronic copy of the as-built drawings. <br /> Page 25 <br /> S:\JMcClell\UP-3193-WFP Chlorine Bldg\EWFP NaQCJ Scope of Work R3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.