My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/05/19 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/05/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 9:10:42 AM
Creation date
2/1/2017 9:10:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 5 <br /> 'PROJECT TITLE: <br /> _ Call for Bids for the Construction X Consent COUNCIL BILL# <br /> of the Northend Basement Flood Action Originating Department PW/Utilities <br /> Reduction "F"Project First Reading Contact Person Jenifer Galatas i <br /> Second Reading Phone Number (425)257-7215 <br /> Third Reading FOR AGENDA OF May 19, 2004 <br /> Public Hearing <br /> Initialed by: <br /> Department H:.• i• <br /> CAA <br /> Council Preside y// <br /> Location Preceding Action Attachments Department(s)Approval <br /> See Attached Project Authorization of Project Location Map <br /> Location Map Amendment to the <br /> Professional Services <br /> Agreement for design, <br /> November 2003. <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ 2,000.00 Account Number(s): UP 3189 <br /> Amount Budgeted $ 1,700,000.00 <br /> Additional Required $ -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Northend Basement Flood Reduction "F"project will replace approximately 6,400 linear feet of <br /> combined sewer mains in North Everett. The existing mains are up to 80 years old; have deteriorated; and <br /> now have sags, flat slopes, directional misalignment, broken joints, root intrusion, and cracked pipe. The <br /> condition of the main lines has contributed to decreased capacity and basement flooding within the project <br /> area. <br /> Within the project area, approximately 25% of the side sewer stubs have failed within the right of <br /> way over the last 15 years. Over half the failures have been within the last 5 years. <br /> This project will decrease basement flooding and sewer failures, providing increased reliability of the <br /> system. <br /> The Professional Services Agreement for the design of this project was approved in November 2003. <br /> The design is now complete and the project is ready to bid for construction. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize a Call for Bids for the construction of the Northend Basement Flood Reduction "F"Project. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.