My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/05/19 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/05/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 9:10:42 AM
Creation date
2/1/2017 9:10:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: <br /> Change Order no. 0 <br /> Change Order Effective Date: <br /> Exhibit A—Description of Changed Work <br /> A. The item being added by this change order is listed below. One new bid item is being added to the <br /> contract by this change order. <br /> Item#14—Additions and Modifications to the Contract. Create a new bid item#14 to pay for the <br /> installation of two each 4-inch diameter blow-offs onto existing cross-town pipeline,installation of blow <br /> off manholes,connecting pipe and valve between blow offs and blow off manholes,and associate <br /> restoration work along the existing cross-town pipeline on 25th Street. <br /> B. Justification of the item being added by this change order <br /> Item#14—Additions and Modifications to the Contract. Sections of the existing cross-town pipeline <br /> contained water in it that could not be drained,as there were no existing blow offs,or in the case of the <br /> existing blow off at North Junior middle school,the school district had constructed a portable classroom <br /> over it making it inaccessible. The City directed Tri-State Construction Inc.to install two each blow offs in <br /> low spots along the pipe alignment. This will allow the future contractor that will be contracted with by the <br /> City to install the new cementitious coating,the ability to immediately drain and begin work on this <br /> existing pipe. <br /> C. Additional Contract Time <br /> No additional time is being added to the contract by this change order. <br /> Exhibit A <br /> Page 4 of 4 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.