My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/05/19 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/05/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 9:10:42 AM
Creation date
2/1/2017 9:10:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA 11 EM,COVER SHEET <br /> PROJECT TITLE: <br /> - Change Order#2 with KLB Consent COUNCIL BILL# <br /> Construction, Inc. for the Northern x Action Originating Department Public Works , <br /> Extension Interurban Trail, Stage 2, First Reading Contact Person Terry Henle <br /> Phase 1 project. Total Amount of Second Reading Phone Number 425-257-8928 <br /> Change Order#2: $ 125,672.16 Third Reading FOR AGENDA OF May 19,2004 <br /> Public Hearing <br /> Initialed by: <br /> Department Hea <br /> CAA <br /> Council President !� <br /> Location Preceding Action Attachments Department(s)Approval <br /> Commercial Ave& the Bid: 7/15/03 Change Order#2 Public Works <br /> Pacific Northern Traction Award: 7/30/03 <br /> right-of-way between C.O.#1: 10/22/03 <br /> Madison St. & 44th St. <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $766,815.86 Account Number(s): PW2857 <br /> Amount Budgeted $ 641,143.70 <br /> Additional Required $ 125,672.16 <br /> DETAILED SUMMARY STATEMENT: <br /> Change Order#2 was written in the amount of$ 125;672.16 to cover the cost of storm drainage additions, <br /> additional roadway excavation and subsequent crushed surfacing top course and the difference between the <br /> actual quantities of work and the quantities originally estimated. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order#2 for the Northern Extension Interurban Trail, Stage 2, Phase 1 <br /> project with KLB Construction, Inc. in the amount of$125,672.16. <br /> 3Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.