Laserfiche WebLink
Project: y <br /> Change Order no. t <br /> Change Order Effective Date: <br /> Exhibit A—Description of Changed Work <br /> A. Items being amended by this change order are listed below. <br /> Work Order 2857 <br /> Item#3—Traffic Control Labor. Amend the contract to add 226 hours of traffic control labor to the <br /> contract. <br /> Item#6—Roadside Cleanup. Amend the contract to deduct$4,475.75 of force account for roadside <br /> cleanup from the contract. <br /> Item#9—Existing Private Improvement Restoration. Amend the contract to deduct$4,130.51 of force <br /> account for existing private improvement restoration from the contract. <br /> Item#10—Sawing Pavement. Amend the contract to add 339 linear feet of sawing pavement to the <br /> contract. <br /> Item#12—Remove Existing Pavement,Type 1,Class B. Amend the contract to deduct 574.21 square <br /> yards of remove existing pavement,type 1,class B from the contract <br /> Item#15—Remove cement concrete sidewalk. Amend the contract to deduct 54.71 square yards of <br /> cement concrete sidewalk from the contract. <br /> Item#16—Roadway Excavation Including Haut Amend the contract to add 825 cubic yards of <br /> roadway excavation including haul to the contract. <br /> Item#17—Remove Catch Basin. Amend the contract to add one additional catch basin removal to the <br /> contract. <br /> Item#18—Gravel Borrow. Amend the contract to deduct 309.95 tons of gravel borrow from the contract. <br /> Item#19—Catch Basin,Type A. Amend the contract to add 5 each catch basin,type A's to the contract. <br /> Item#20—Adjust Catch Basin to Grade. Amend the contract to add one each catch basin adjustment to <br /> grade to the contract. <br /> Item#21—Furnish&Install Solid Lid for Catch Basin. Amend the contract to add two each furnish& <br /> install solid lid for catch basin to the contract. <br /> Item#22—Storm Sewer Pipe,8-Inch Diameter. Amend the contract to add 17 linear feet of 8-inch <br /> diameter storm sewer pipe to the contract. <br /> Item#23—Storm Sewer Pipe,12-Inch Diameter.Amend the contract to add 5 linear feet of 12-inch <br /> diameter storm sewer pipe to the contract. <br /> Item#24—Ductile Iron Storm Sewer Pipe,8-inch Diameter. Amend the contract to add 35 linear feet <br /> of 8-inch diameter ductile iron storm sewer pipe,to the contract. <br /> Item#25—Connect to Drainage Structure.Amend the contract to add three each connections to drainage <br /> structure to the contract. <br /> Item#26—Adjust Manhole to Grade. Amend the contract to deduct one each adjustment of manhole to <br /> grade from the contract. <br /> Item#28—Adjust Valve Box to Grade. Amend the contract to deduct 5 each adjustment of valve boxes <br /> to grade from the contract. <br /> Item#29—Pavement Patch,Asphalt Concrete,Class B. Amend the contract to add 43.08 tons of <br /> asphalt concrete pavement patch,Class B. <br /> Item#30—Crushed Surfacing Top Course. Amend the contract to add 563.25 tons of crushed surfacing <br /> top course to the contract. <br /> Item#31—Asphalt Treated Base. Amend the contract to deduct 24.40 tons of asphalt treated base from <br /> the contract. <br /> Exhibit A <br /> Page 4 of 10 `j <br />