Laserfiche WebLink
C11'Y U14 EVI K1;Tr <br /> 3 FINAL CONTRACT VOUCHER CER'1'1hICATION <br /> CONTRACTOR: Marshbank Construction ADDRESS: P 0 Box 97 <br /> CITY: Lake Stevens STATE: WA 98258-0097 DATE: March 5, 2004 <br /> PROJECT 1'1'1LE: 112th St.-Evergreen to Airport WORK ORDER NO. 2939 <br /> DATE WORK COMPLETE: March 4, 2004 FINAL AMOUNT: $ 1,723,053.93 <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased anyequipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> understand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> which I m have, 'ng out of the performance of said contract, which aregat ►4-th in said estimate. <br /> �-- PfeS p sA <br /> C CTOR TITLE s�=�� +.o cy,'•,� <br /> Marshbank Construction �; N=rARy <br /> .5 <br /> :0 <br /> i ZS <br /> cn� PUBLIC <br /> Subscribed and sworn o before <br /> e this •ay of Ali <br /> • i,.�li&11 r OWL otary Public ►'h,�F tNASN�NG'� <br /> i d for the State of Washington,residing at 'UU^`�-� � (kb - %:::•••• <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final APPROVED Date: 5—j 7--ey <br /> estimate to be based upon actual <br /> measure,•is and to be true and correct. <br /> X k '111 1., die•T_ - X 16t9 467ft <br /> Con -s ction Manager Utilities Director <br /> Terry Henke Tom Thetford <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 9/94 <br /> 10 <br />