Laserfiche WebLink
Run Date: 4/16/2004 City of Everett-Public Works Department Cutoff Date: 4/16/2004 <br /> Time: 1:54 PM Contract Estimate Voucher <br /> Project: 167 For Work Order#3150 Contractor: TRANSTECH ELECTRIC, INC. <br /> 2003 SIGNAL IMPROVEMENTS Estimate #4 P 0 BOX 7429 <br /> WO 3150 BID:$66,576.80 KENT WA 98042 <br /> TOTAL BID:$66,576.80 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Mobilization LS 5,600.00 1.00 1.0000 1.0000 0.0000 5,600.00 5,600.00 0.00 <br /> 0002 Maintenance&protec tion of traffic control LS 300.00 1.00 1.0000 1.0000 0.0000 300.00 300.00 0.00 <br /> 0003 Traffic control labor HR 39.00 200.00 143.5000 124.0000 19.5000 5,596.50 4,836.00 760.50 <br /> 0004 Construct signal flasher sys.Merrill/Hardeson LS 28,539.00 1.00 1.0000 1.0000 0.0000 28,539.00 28,539.00 0.00 <br /> 0005 Signal modifications Broadway/12th St LS 5,025.00 1.00 1.0000 1.0000 0.0000 5,025.00 5,025.00 0.00 <br /> 0006 Remove cement conc.curb&gutter LF 24.00 ' 100.00 111,5000 143.0000 -31.5000 2,676.00 3,432.00 -756.00 <br /> 0007 Remove cement con crete sidewalk SY 44.28 40.00 50.0000 50.0000 0.0000 2,214.00 2,214.00 0,00 <br /> 0008 Sawing pavement LF 3.50 200.00 224.0000 224.0000 0.0000 784.00 784.00 0.00 <br /> 0009 Crushed surfacing top course TN 108.00 7.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0010 Cement concrete sidewalk SY 51.84 40.00 50.0000 50.0000 0.0000 2,592.00 2,592.00 0.00 <br /> 0011 Cement concrete curb&gutter,type A-1 LF 24.84 100.00 111.5000 125.0000 -13.5000 2,769.66 3,105.00 -335.34 <br /> 0012 Cement concrete curb ramp EA 972.00 5.00 7.0000 7.0000 0.0000 6,804.00 6,804.00 0.00 <br /> 0013 Incidental asphalt concrete,class B TN 324.00 7.00 1.5000 1.5000 0.0000 486.00 486.00 0.00 <br /> 0014 Existing private improve ment restoration LS 1.00 1,000.00 252.0000 252.0000 0.0000 252.00 252.00 0.00 <br /> 0015 Remove beam guardrail LF 50.00 20.00 14.0000 14.0000 0.0000 700.00 700.00 0.00 <br /> 0016 MOH LS 1.00 12,489.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0017 Cement concrete sidewalk SY 47.18 69.22 69.2200 0.0000 69.2200 3,265.80 0.00 3,265.80 <br /> 0018 Remove cement concrete sidewalk SY 40.52 73.62 73.6200 0.0000 73.6200 2,983.08 0.00 2,983.08 <br /> Work Order Totals: 70,587.04 64,669.00 5,918.04 <br /> Cx. CI <br /> G <br />