Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA I`1-EM.COVER SKEET $ <br /> -PROJECT TITLE: <br /> Professional Services Agreement for Consent COUNCIL BILL# <br /> - Engineering Design Services for X Action Originating Department Utilities <br /> Evergreen Way Pump Station First Reading Contact Person John McClellan <br /> Improvements Project with R.W. Beck Second Reading Phone Number 257-7214 <br /> Third Reading FOR AGENDA OF July 2, 2004 <br /> Public Hearing <br /> Initialed by: <br /> Department Head ''"-<.-7-n""•-, <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Reservoir 3 Contract for Engineering Professional Services Utilities <br /> Study Agreement(PSA) <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ 382,000 Account Number(s): 401 <br /> Amount Budgeted $ 5,500,000 <br /> Additional Required $ -0- <br /> DETAILED SUMMARY STATEMENT: <br /> R.W.Beck recently completed an engineering study of the capacity and needs of the Evergreen Way pump <br /> station at Reservoir 3. The study provided a schedule of improvements required at the pump station to <br /> increase the capacity of the pump station and water transmission pipelines in anticipation of increasing <br /> demands for water. This engineering contract will provide for the design of upgrades to the pump station, <br /> including upgrades to existing pumps and electrical equipment, adding two new pumps, expanding the pump <br /> station building to accommodate the new equipment,providing for electrical connection to a mobile <br /> emergency generator, and improvements to the suction piping from Reservoir 3 to the pump station. The <br /> contract will also provide for engineering support during construction of the improvements. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign the Professional Services Agreement for engineering services to be provided by <br /> R.W. Beck for improvements to the Evergreen Way pump station. <br /> 17 <br /> S:VMcCkll\UP-3 138_Evug..n_Wy_PS\CONTRACT-DESIGN\Councl_Agcnda-EPS_Daign.doc <br />