My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/08/04 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/08/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2017 10:14:21 AM
Creation date
2/3/2017 10:13:23 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/4/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: 9 <br /> Change Order#6 with Synagro X Consent COUNCIL BILL# <br /> Technologies, Inc. for the Biosolids Action Originating Department Public Works <br /> and Backwash Solids Removal First Reading Contact Person Terry Henke(\," <br /> Project. Total Amount of Change Second Reading Phone Number 425-257-8928 <br /> Order#6: $ 392,860.00 Third Reading FOR AGENDA OF Aug. 4,2004 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA Cik) <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> WFP and WPCF Award: 5/22/02 Change Order#6 Public Works <br /> CO#1: 7/12/02 <br /> CO#2: 8/30/02 <br /> CO#3: 9/10/02 <br /> CO#4: 3/24/04 <br /> CO#5: 7/21/04 <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ 2,335,735.60 Account Number(s): UT2600-4-1 <br /> Amount Budgeted $ 1,942,875.60 <br /> Additional Required $ 392,860.00 <br /> DETAILED SUMMARY STATEMENT: <br /> Change Order No. 6 was written to allow for an additional 2000 dry tons of Biosolids to be dredged <br /> and dewatered which will provide ample storage volume and adequate treatment in preparation for <br /> the next Biosolids removal in 2006. As a result of the additional tonnage,there is an increase of 30 <br /> days to the duration of the contract and a increase in price to $196.43 per dry ton for the additional <br /> 2000 dry tons in Phase 2 only for a total of$392,860.00. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order No. 6 for the Biosolids and Backwash Solids Removal project <br /> with Synagro Technologies,Inc. to allow an additional 2000 dry tons of Biosolids to be dredged and <br /> dewatered for a change order total of$392,860.00. <br /> 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.