9 <br /> Project: <br /> Change Order: 6 <br /> Change Order Effective Date: July 21,2004 <br /> Exhibit A—Description of Changed Work <br /> To assure our biosolids are treated and meet State and Federal Regulations for beneficial <br /> reuse, adequate storage volume in the aeration cells at the WPCF is critical. During the 2004 <br /> biosolids removal, the parties agree that an additional 2000 dry tons of biosolids must be <br /> dredged and dewatered to provide ample storage volume and adequate treatment in <br /> preparation for the next biosolids removal in 2006. <br /> This change order: <br /> 1) Increases the length of time,by 30 days, for completion of Phase 2 (Year 2004). <br /> Section 1.36 Time of Completion is therefore amended to read as follows, "The <br /> Contractor shall have 90 calendar days from the notice to proceed to complete the <br /> 2004 biosolids removal." This change is only effective for Phase 2 of this Contract. <br /> 2) Modifies the price per dry ton for biosolids dredging and dewatering. The Bid <br /> Schedule is revised to include mobilization, dredging and dewatering for up to 2000 <br /> dry tons at$196.43/dry ton for Phase 2 of the Contract.This creates an increase of <br /> $392,860 for Phase 2 of this Contract, is only effective for Phase 2 and is subject to <br /> available storage area for dewatered biosolids. This represents 17% of the total <br /> adjusted Contract value. <br /> Exhibit A <br /> Page 3 of 3 <br /> 41 <br />