Laserfiche WebLink
' Run Date: 7/6/2004 City of Everett-Public Works Department Cutoff Date: 6/11/2004 <br /> Time: 8:56 AM Contract Estimate Voucher <br /> Project: 165 For Work Order#2857 <br /> Contractor: KLB CONSTRUCTION <br /> INTERURBAN TRAIL(MADISON TO Estimate#7 P,O.BOX 158 <br /> 44TH ST) <br /> WO 2857 BID:$739,954.36 MUKILTEO WA 98275 <br /> TOTAL BID:$766,815.86 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0055 Park bench EA 1,500.00 1.00 1.0000" 1.0000 0.0000 1,500.00 1,500.00 0.00 <br /> 0056 PSIPE Zabel Laurel EA 50.00 24.00 24.0000 24.0000 0.0000 1,200.00 1,200.00 0.00 <br /> '057 PSIPE Thuja Occiden tails 5'•6'(Pyramidalis) EA 80.00 36.00 36.0000 '1 36.0000 0.0000 2,880.00 2,880.00 0.00 <br /> 0058 Topsoil,type C CY 100,00 10.00 9.0000 4 6.0000 3.0000 900.00 600.00 300.00 <br /> 0059 Bark mulch CY 100.00 5.00 5.0000 'I 5.0000 0.0000 500.00 500.00 0.00 <br /> 0060 Hydroseeding SY 3.00 600.00 750.0000 V 750.0000 0.0000 2,250.00 2,250.00 0.00 <br /> 0061 Permanent Signing LS 2,500.00 1.00 1.0000 J 1.0000 0.0000 2,500.00 2,500.00 0.00 <br /> 0062 Flashing crosswalk system LS 40,000.00 1.00 1.0000 V 1.0000 0.0000 40,000.00 40,000.00 0.00 <br /> 0063 Paint line LF 0.16 2,500.00 5,054.0000 5,054.0000 0,0000 808.64 808.64 0.00 <br /> 0064 Painted wide line LF 0.22 4,610.00 7,812.0000 7,812.0000 0.0000 1,718.64 1,718.64 0.00 <br /> 0065 Plastic crosswalk line LF 2.20 810,00 690.0000 690.0000 0.0000 1,518.00 1,518.00 0.00 <br /> 0066 Bicycle symbol EA 35.00 13.00 14.0000 14.0000 0.0000 490.00 490.00 0.00 <br /> 0067 Plastic stop line LF 6.00 35.00 24.0000 J 24.0000 0.0000 144.00 144.00 0.00 <br /> 0068 Minor change FA 1.00 5,000.00 1,227.6000 ,✓ 1,227.6000 0.0000 1,227.60 1,227.60 0.00 <br /> 0069 Spill prevention,control&countermeasures LS 500.00 1.00 1.0000'/ 1.0000 0.0000 500.00 500.00 0.00 <br /> plan <br /> ,070 Asphalt wedge curb LF 5.00 0.00 0.0000's 0.0000 0.0000 0.00 0.00 0.00 <br /> 0073 Asphalt lip curb LF 5.00 760.00 0.0000'F 0.0000 0.0000 0.00 0.00 0,00 <br /> 0075 Type II CB,54"diem w/gas trap&float.mat,sep EA 3,200.00 1.00 0.0000 ( 0.0000 0.0000 0.00 0.00 0.00 <br /> 0078 Storm sewer pipe,8"diameter LF 38.00 459.00 459.0000 1 434.0000 25,0000 17,442.00 16,492.00 950,00 <br /> 0079 Storm sewer pipe, 12'diameter LF 47.50 639.00 639.0000 '1 639.0000 0.0000 30,352.50 30,352.50 0.00 <br /> 0080 Fence,type 6,vinyl coated LS 2,390.00 1.00 1.0000 J 1.0000 0.0000 2,390.00 2,390.00 0.00 <br /> 0081 Roadway excavation Including haul CY 13.50 2,358.23 2,358.2300 2,358.2300 0.0000 31,836.11 31,836.11 0.00 <br /> 0082 CSTC TN 17.00 4,136.04 4,136.04001 4,136.0400 0.0000 70,312.68 70,312.68 0.00 <br /> ' "a 0083 Paint stripe removal LF 0.40 5,673.00 '5,673.0000 5,673.0000 0.0000 2,269,20 2,269.20 0.00 <br /> N 0084 Painted crosswalk LF 2.50 377.00 377.0000 Y 377.0000 0.0000 942.50 942.50 0,00 <br /> 0085 Remove plastic stop bar&crosswalk SF 2,25 : 206.00 206.0000 V 206.0000 0.0000 463.50 463.50 0.00 <br />