My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/08/11 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/08/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2017 10:45:16 AM
Creation date
2/3/2017 10:44:27 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/11/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 3 <br /> PROJECT TITLE: <br /> Call for Bids for the Construction X Consent COUNCIL BILL# <br /> of the Water Main Replacement Action Originating Department PW/Utilities <br /> "F"Project First Reading Contact Person Jenifer Galatasrk. <br /> Second Reading Phone Number 257-7215 <br /> Third Reading FOR AGENDA OF August 11,2004 <br /> Public Hearing <br /> Initialed by: <br /> Department Hea� _, <br /> CAA <br /> Council Presiden <br /> Location Preceding Action Attachments Department(s)Approval <br /> See Attached Project Authorization of Project Location Map <br /> Location Map Professional Services <br /> Agreement for Design, <br /> October 2003 <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ 2,000.00 Account Number(s): UP 3185 <br /> Amount Budgeted $ 1,100,000.00 <br /> Additional Required $ -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Water Main Replacement "F"project will replace approximately 7,400 linear feet of undersized and <br /> deteriorated asbestos cement water mains. The replacement of these mains will provide increased reliability <br /> of the system. <br /> The estimated useful life for asbestos cement water mains is 50 years. The water mains within the project <br /> limits are all reaching the end of this estimated useful life. This is confirmed by the increased number of <br /> leaks and breaks that have occurred in the past couple of years. <br /> The Professional Services Agreement for the design of this project was approved in October 2003. The <br /> design is now complete and the project is ready to bid for construction. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize a Call for Bids for the construction of the Water Main Replacement "F" Project. <br /> ':J(,abtas\Taxer Fn.11•1:\_rndh hwn D X' ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.