Laserfiche WebLink
CTi <br /> Run Date: 7/8/2004 City of Everett-Public Works Department Cutoff Date: 6/11/2004 <br /> Time: 8:43 AM Contract Estimate Voucher <br /> Project: 162 For Work Order#29815 Contractor: WILDER CONSTRUCTION <br /> EVERGREEN WAY-41ST TO 47TH Estimate#13 3315 15TH ST <br /> WO 29818 BID:$51,515.00 EVERETT WA 98201 <br /> TOTAL BID:$2,228,845.87 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Sawing pavement LF 2.00 830.00 921.0000 921.0000 0.0000 1,842,00 1,842.00 0.00 <br /> 0002 Remove existing con crete curb&gutter HR 7.00 410.00 410.0000 410.0000 0.0000 2,870.00 2,870.00 . 0,00 <br /> 0003 Remove existing concrete sidewalk SY 5.00 275,00 275.0000 275.0000 0.0000 1,375.00 1,375.00 0.00 <br /> 0004 Roadway excavation,including haul CY 16.00 200.00 200.0000 200.0000 0.0000 3,200.00 3,200.00 0.00 <br /> 0005 Crushed surfacing top course TN 23.00 150,00 150.0000 150.0000 0.0000 3,450.00 3,450.00 0.00 <br /> 0006 Asphalt treated base TN 75.00 90.00 74.4690 74.4690 0.0000 5,585.18 5,585.18 0,00 <br /> 0007 Asphalt concrete pavement,CL B TN 85.00 60.00 38.6080 38.6080 0.0000 3,281.68 3,281.68 0.00 <br /> 0008 Relocate existing bollards FA 1.00 2,000.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0009 Concrete Inlet EA 1,200.00 3.00 6.0000 6.0000 0.0000 7,200.00 7,200.00 0.00 <br /> 0010 Storm drain pipe 8"diameter LF 31.00. 300.00 51.0000 51.0000 0.0000 1,581,00 1,581.00 0.00 <br /> 0011 Cement concrete curb&gutter,type A-1 LF 13.00 410.00 403.0000 403.0000 0,0000 5,239.00 5,239.00 0.00 <br /> 0012 Cement concrete sidewalk SY 28.00 210.00 248.0000 248.0000 0.0000 6,944.00 6,944.00 0.00 <br /> 0013 Cement concrete driveway SY 40.00 25.00 23.3400 23.3400 0.0000 933.60 933.60 0.00 <br /> Work Order Totals: 43,501.46 43,501.46 0,00 <br />