My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/08/18 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/08/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2017 10:52:46 AM
Creation date
2/3/2017 10:52:31 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/18/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Call for Bids for Construction of the X Consent COUNCIL BILL# <br /> Y Alum Storage Buildingand Plant <br /> Action Originating Department Utilities <br /> Water Pumps Project at the Water First Reading Contact Person John McClellan <br /> Filtration Plant Second Reading Phone Number 257-7214 <br /> Third Reading FOR AGENDA OF 18 August 2004 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Filter Plant Consultant Design none Public Works -Utilities <br /> Contract <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ 500 Account Number(s): 401 <br /> Amount Budgeted $ 1,610,000 <br /> Additional Required $ _0_ <br /> DETAILED SUMMARY STATEMENT: <br /> The 2002 Water Filtration Plant (WFP) Facilities Plan outlined project recommendations to maintain and <br /> improve operations at the plant. Recommended projects include construction of a building to house the <br /> existing bulk storage tanks for liquid alum and polymer, and associated equipment; and construction of a new <br /> plant water pumping station. This advertisement for bids is for the construction of the alum storage building <br /> and plant water pumps project, the design of which has been completed by Brown & Caldwell. The <br /> engineer's estimate for this project is $1.17 million. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize a call for bids for construction of the Alum Storage Building and Plant Water Pumps project. <br /> S:111c('Ir0l P-2•,••_\11 P IIIUUIKG('CA mda-FIP Ad for Bid.doc i <br />
The URL can be used to link to this page
Your browser does not support the video tag.