My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/01/12 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/01/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2017 11:23:08 AM
Creation date
2/3/2017 11:22:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/12/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> 3 <br /> SCOPE OF WORK <br /> The Contractor is employed to render a professional service only, and any payments made to the <br /> Contractor are compensation solely for such services rendered and recommendations made in <br /> carrying out the work. <br /> 1. The Contractor agrees to furnish the services of a licensed professional land surveyor and <br /> appropriate technical support/survey field personnel, as requested by the City, to provide <br /> survey support for the City. <br /> 2. The survey crew shall work on an"as requested"basis only, as determined by the City's <br /> Project Manager or Construction Engineer. If the Contractor is not in a position to provide <br /> the survey crew at the time required by the City, then the Contractor may decline the request <br /> by the City without prejudice. <br /> 3. Following acceptance of a request for surveying services, the Contractor will prepare a <br /> written, itemized, cost estimate for the requested services. The Contractor shall not <br /> proceed with any further work,until the scope identified in the itemized cost estimate <br /> (Exhibit C) has been authorized by the signature of the City representative and signed <br /> by the Contractor. <br /> 4. The survey crew shall be supervised by a licensed PLS, and shall coordinate with the Project <br /> Manager and/or the Construction Engineer, as required, to ensure that all the required <br /> surveying on the various projects is performed, as requested by the City. <br /> 5. The survey party chief shall be responsible to keep all notes in a City supplied survey book <br /> and shall record a day-to-day report of all survey activities. Said survey book shall be <br /> returned to the City Project Manager or Construction Engineer at the completion of the work. <br /> Survey field notes shall conform to the requirements of the most recent edition of the <br /> "Surveying and CAD Standards for the City of Everett. <br /> 6. All survey drawings, cross sections and profiles shall be prepared in AutoCAD in accordance <br /> with the most recent edition of the"Surveying and CAD Standards for the City of Everett. <br /> 7. The surveyor shall schedule and meet with the City surveyor and CAD manager prior to <br /> beginning any survey work to establish control, required standards, and pick up a field book. <br /> This is required for each project. <br /> 14 <br /> Rev9808 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.