My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/01/12 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/01/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2017 11:23:08 AM
Creation date
2/3/2017 11:22:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/12/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> B. The Contractor shall be paid such amounts and in such manner as described in Exhibit B. <br /> C. Contractor may receive payment as reimbursement for Eligible Expenses actually incurred. <br /> "Eligible Expenses" means those types and amounts of expenses either listed in Exhibit C or such <br /> expenses as are approved for reimbursement by the City in writing prior to the expense being incurred. <br /> If Exhibit C is either blank or not attached, expenses may not be reimbursed unless prior written <br /> approval was obtained from the City. An expense shall not be reimbursed if: (1) the expense is not <br /> identified in Exhibit C; (2) the expense exceeds the per item or cumulative limits for such expense if it <br /> is identified in Exhibit C; or (3) the expense was not approved in writing by an authorized City <br /> representative prior to the Contractor incurring the expense. If, and to the extent, overnight lodging <br /> in western Washington is authorized, Contractor is strongly encouraged to lodge within the corporate <br /> limits of City. When authorized, Contractor will be reimbursed 100% of lodging expense, if lodged <br /> within the corporate limits of the City, but Contractor will be reimbursed 50% of lodging expense <br /> when lodged outside the corporate limits of the City. If authorized, the City may (at its sole option) <br /> obtain or arrange air travel for the Contractor. <br /> D. If Contractor fails or refuses to correct its work when so directed by the City, the City may <br /> withhold from any payment otherwise due an amount that the City in good faith believes is equal to the <br /> cost to the City of correcting, re-procuring, or remedying any damage caused by Contractor's conduct. <br /> 5. Method of Payment. <br /> A. To obtain payment, the Contractor shall (a) file its request for payment, accompanied by <br /> evidence satisfactory to the City justifying the request for payment; (b) submit a report of Work <br /> accomplished and hours of all tasks completed; (c) to the extent reimbursement of Eligible Expenses is <br /> sought, submit itemization of such expenses and, if requested by the City, copies of receipts and <br /> invoices; and (d) comply with all applicable provisions of this Agreement. Contractor shall be paid no <br /> more often than once every thirty days. <br /> B. All requests for payment should be sent to: <br /> City of Everett <br /> Attn: Project Engineer <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> 6. Submission of Reports and Other Documents. The Contractor shall submit all reports and <br /> other documents specified in Exhibit A. Said information shall be subject to review by the City, and if <br /> found to be unacceptable, Contractor shall correct and deliver to the City any deficient Work at <br /> Contractor's expense with all practical dispatch. Contractor shall abide by the City's determinations <br /> concerning acceptability of Work. <br /> 7. Termination of Contract. City reserves the right to terminate this Agreement at any time by <br /> sending written notice of termination to Contractor ("Notice"). The Notice shall specify a termination <br /> date ("Termination Date") at least fourteen (14) days after the date the Notice is issued. The Notice <br /> shall be effective ("Notice Date") upon the earlier of either actual receipt by Contractor (whether by <br /> fax, mail, delivery or other method reasonably calculated to be received by Contractor in a reasonably <br /> prompt manner) or three calendar days after issuance of the Notice. Upon the Notice Date, Contractor <br /> shall immediately commence to end the Work in a reasonable and orderly manner. Unless terminated <br /> for Contractor's material breach, the Contractor shall be paid or reimbursed for: (a) all hours worked <br /> and Eligible Expenses incurred up to the Notice Date, less all payments previously made; and (b) those <br /> Rev9808 2 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.