Laserfiche WebLink
CITY OF EVERETT <br /> REVISED FINAL CONTRACT VOUCHER CER I'ThTCATION <br /> IONTRACTOR: Pacific Crest Construction ADDRESS: 13619 Mukilteo Speedway <br /> IITY: Mukilteo STATE: WA 98037 DATE: January 10, 2005 <br /> 3ROJECT TITLE: WPCF Maintenance Building WORK ORDER NO. UP2993 <br /> DATE WORK COMPLETE: December 3, 2004 FINAL AMOUNT: $ 2,267,446.37 <br /> CONTRACTOR'S CERTIFICATION <br /> [, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> mnd material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> ponies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> inderstans sa • :nd •,.t I hereby release the City of Everett from any and all claims of whatsoever nature <br /> which j(hav=, ansin:'t of the performance of said contract, which are not set forth in said estimate. <br /> KV X ?/1i5/./7 Ce>c <br /> C I, TRACTOR TITLE <br /> Pacific Crest Construction <br /> ,aU�►�+rnr�iyg . <br /> o L. Ally <br /> ubscri.ed ��� �t. ��'•� z- <br /> S <br /> is ' f 02 <br /> Ke /.�.. ,M-272:/",„„::_. ry Pary Public <br /> in and foraheI State" Wash i don, residing at1(/(7)'[/'&/ <br /> • <br /> s 1A401, <br /> Of w S�,M��,,• <br /> "%pis""'"o PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> [ Certify the attached final APPROVED Date: ( 0-6) <br /> estimate to be based upon actual <br /> measurements and to be true and correct. <br /> K X <br /> Construction Manager Utilities Director <br /> 'Fefry-Henke Torn F uCH s Tom Thetford <br /> INSTRUCTIONS <br /> Me Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> 2ontractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> devised 9/94 <br /> 5 <br />