Laserfiche WebLink
5 <br /> performed or services rendered, including, but not limited to, all labor, materials, supplies, <br /> equipment and incidentals necessary to complete the Work. <br /> B. The Contractor shall be paid such amounts and in such manner as described in Exhibit <br /> B. <br /> C. Contractor may receive payment as reimbursement for Eligible Expenses actually <br /> incurred. "Eligible Expenses" means those types and amounts of expenses either listed in <br /> Exhibit C or such expenses as are approved for reimbursement by the City in writing prior to the <br /> expense being incurred. If Exhibit C is either blank or not attached, expenses may not be <br /> reimbursed unless prior written approval was obtained from the City. An expense shall not be <br /> reimbursed if: (1) the expense is not identified in Exhibit C; (2) the expense exceeds the per item <br /> or cumulative limits for such expense if it is identified in Exhibit C; or (3) the expense was not <br /> approved in writing by an authorized City representative prior to the Contractor incurring the <br /> expense. If, and to the extent, overnight lodging in western Washington is authorized, <br /> Contractor is strongly encouraged to lodge within the corporate limits of City. When authorized, <br /> Contractor will be reimbursed 100% of lodging expense, if lodged within the corporate limits of <br /> the City, but Contractor will be reimbursed 50% of lodging expense when lodged outside the <br /> corporate limits of the City. If authorized, the City may (at its sole option) obtain or arrange air <br /> travel for the Contractor. <br /> D. Total compensation, including all services and expenses, shall not exceed a maximum of <br /> Twenty Eight Thousand Four Hundred and Thirty Nine Dollars ($28,439.00). <br /> E. If Contractor fails or refuses to correct its work when so directed by the City, the City <br /> may withhold from any payment otherwise due an amount that the City in good faith believes is <br /> equal to the cost to the City of correcting, re-procuring, or remedying any damage caused by <br /> Contractor's conduct. <br /> 5. Method of Payment. <br /> A. To obtain payment, the Contractor shall (a) file its request for payment, accompanied by <br /> evidence satisfactory to the City justifying the request for payment; (b) submit a report of Work <br /> accomplished and hours of all tasks completed; (c) to the extent reimbursement of Eligible <br /> Expenses is sought, submit itemization of such expenses and, if requested by the City, copies of <br /> receipts and invoices; and (d) comply with all applicable provisions of this Agreement. <br /> Contractor shall be paid no more often than once every thirty days. <br /> B. All requests for payment should be sent to: <br /> City of Everett <br /> Attn: Tom Hingson <br /> 3225 Cedar Street <br /> Everett, WA 98201 <br /> 15 <br />