Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Consent COUNCIL BILL # <br /> Authorize Call for Construction X Action Originating Department Public Works <br /> Bids for the Replacement of First Reading Contact Person Souheil Nasr <br /> Water Transmission Lines 2 & 3, Second Reading Phone Number (425) 257-7210 <br /> Phases 6 & 7 Project Third Reading FOR AGENDA OF Feb. 14, 2005 <br /> Public Hearing <br /> Initialed by: <br /> Department <br /> CAA <br /> Council President 5j77L <br /> Location Preceding Action Attachments Department(s) Approval <br /> Snohomish River Estuary Authorization to Sign Legal <br /> between the Snohomish Professional Services <br /> River and Ebey Slough. Agreement with MWH <br /> Americas,Inc. to Complete <br /> Engineering Design and <br /> Permitting Services for <br /> Replacement of Water <br /> Transmission Lines 2 & 3 <br /> — Phases 6 and 7. <br /> Amount Budgeted $1 1,900,000 <br /> Expenditure Required $0 Account Number(s): <br /> Budget Remaining $1 1,900,000 UP 3141-3 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> The Replacement for Water Transmission Lines No. 2 & 3 - Phases 6 & 7 Project is ready to advertise for <br /> construction bids. This project will replace approximately 12,000 feet of the existing elevated 48" diameter <br /> Water Transmission Lines No. 2 & 3 between the Snohomish River and Ebey Slough. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize a Call for Construction bids for the Replacement of Water Transmission Lines No. 2 & 3 - Phases <br /> 6 & 7 Project located at Snohomish River Estuary between the Snohomish River and Ebey Slough. <br /> 5 <br />