My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/02/14 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/02/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2017 11:59:57 AM
Creation date
2/3/2017 11:59:46 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/14/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 4 <br /> • <br /> PROJECT TITLE: <br /> Authorize the Mayor to sign Consent COUNCIL BILL # <br /> Supplement 1 to the WSDOT X Action Originating Department PW/Utilities <br /> Utility Construction Agreement First Reading Contact Person Jenifer Galatas <br /> for SR 527, 132' to 112th Second Reading Phone Number (425)257-7215.(-t/ <br /> Street SE Widening Third Reading FOR AGENDA OF February 14,2005 <br /> Public Hearing <br /> Initialed by: <br /> Department H .t , <br /> CAA ' r <br /> Council Presiden <br /> Location Preceding Action Attachments Department(s)Approval <br /> See Vicinity Map Authorization to sign the Vicinity Map Legal <br /> Utility Construction <br /> Agreement, September Utility Construction <br /> 2003 Agreement Supplement 1 <br /> Amount Budgeted $850,000.00 <br /> Expenditure Required $257,000.00 Account Number(s): UP 3086 <br /> Budget Remaining $593,000.00 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The City requested the Washington State Department of Transportation (WSDOT)to include a new sewer <br /> main in the SR 527 Widening project. The new sewer main will redirect Lift Station No. 36 flows that are <br /> currently pumped to Lift Station No. 24 to the South End Interceptor. In September 2003,the Council <br /> authorized the Mayor to sign a Utility Construction Agreement. The Utility Construction Agreement <br /> estimated the costs to construct the improvements based on the State's Engineering Estimate. <br /> On February 25, 2005, Bids were received for the SR 527 Widening project. Based on these bids and <br /> engineering considerations, the cost for the sewer main increased by approximately$257,000 to a total cost <br /> of approximately$832,000. Supplement 1 to the Utility Construction Agreement covers this increased cost <br /> to construct the Sewer Main. The Supplement also estimates the increased cost of water line modifications <br /> resulting from the widening project that will be paid for by the State. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Supplement 1 to the WSDOT Utility Construction Agreement for SR 527, 132nd <br /> to 112th Street SE Widening at a cost of$257,000 to the City. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.