Laserfiche WebLink
6 <br /> AMENDMENT NO. 2 TO PROFESSIONAL SERVICES AGREEMENT BETWEEN <br /> THE CITY OF EVERETT <br /> AND <br /> BROWN & CALDWELL, INC. <br /> The City and Brown & Caldwell, Inc. agree to amend and modify their professional <br /> services agreement dated January 15th,2003 (the "Agreement") as follows: <br /> 1. The following work is added to the Scope of Work described in Exhibit A of the <br /> Agreement: Additional construction support and office engineering. <br /> 2. Paragraph 4(D) is modified to read as follows: <br /> Total compensation, including all services and expenses, shall not exceed a <br /> 'maximum of Two Hundred and Thirty Two Thousand and Five Hundred and <br /> Forty One Dollars ($232,541.00),representing an increase of$48,000.00 over the <br /> previously amended contract amount of$184,541.00. <br /> 3. New tasks are added to the scope of this project, including additional design work for the <br /> bulk alum and polymer storage building, and the plant water building, as described in the <br /> attached Exhibit A, "Everett HP—Construction Support Scope". <br /> 4. The effective date of this Amendment is January 1st, 2005. <br /> 5. All terms,conditions and provisions of the Agreement remain in full force and effect <br /> except as expressly modified by this Amendment, <br /> CITY OF EVERETT BROWN & CALDWELL,INC. - <br /> WASHINGTON 701 Pike Street, Seattle,Washington 98101 <br /> By: <br /> By: Typed/Print: _ e: E UJ t <br /> Ray Stephanson,Mayor Position/Of t /tut__ ;r <br /> A FIEST: APPROVED AS TO FORM: <br /> Sharon Marks, City Clerk James D. Iles,City Attorney <br /> 16 <br /> C:\Docoments and Seningstrgiesbrecht\Local Settings\Temporary Internet Fiks\OLK51\UP-2885-PSA_Amdm_no_2(2).doc(Y7 711511999) <br />