, EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 7 <br /> PROJECT TITLE: <br /> Change Order#1 with X Consent COUNCIL BILL# <br /> Glacier Construction Services Action Originating Department Public Works <br /> for the Perimeter Gas First Reading Contact Person Mark Sadler <br /> Collection System project. Second Reading Phone Number 425-257-8967 <br /> Total Amount of Change Order Third Reading FOR AGENDA OF Feb. 23, 2005 <br /> #1: $150,000.00 Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President , <br /> Location Preceding Action Attachments Department(s)Approval <br /> See Vicinity Map Bid: 9/2/03 Change Order#1 Public Works <br /> Award: 9/10/03 <br /> Amount Budgeted $ 1,200,000.00 <br /> Expenditure Required $ 1,043,162.00+WSST Account Number(s): UP 2952 <br /> Budget Remaining $ 156,838.00 <br /> Additional Required $ 120,282.00+WSST <br /> DETAILED SUMMARY STATEMENT: <br /> This construction project is to install a landfill gas collection system on the north and west sides of the <br /> Everett Landfill because landfill gas was migrating beyond the landfill boundary at levels that exceeded <br /> Dept. of Ecology standards. The project was substantially completed in April 2004. The contract was then <br /> suspended while the system and landfill gas stabilized for period of time, and then tested for compliance. <br /> Landfill gas testing during this initial start up period indicated that landfill gas levels at two smaller locations <br /> still exceed regulated levels. <br /> Change Order#1 is for$120,282.00 and 35 construction days to be added to the construction contract with <br /> Glacier Construction Services for the cost and time to construct some additional landfill gas collection <br /> system at these two locations. The project when completed will address the locations that now exceed the <br /> Ecology standards and then bring the landfill into regulatory compliance. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order#1 for the Perimeter Landfill Gas Collection project with Glacier <br /> Construction Services in the amount of$ 120,282.00. <br /> 18 <br /> C:\Documents and Settings\NHansen\L.ocal Settings\Temporary Internet Files\OLK43\MS-CO-Perimeter-2-23-05.DOC <br />