My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/03/09 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/03/09 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2017 2:00:07 PM
Creation date
2/7/2017 1:59:36 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/9/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jv] ri CIIV (:01,1\ IL-1v1) A ;_ii \.12��1� L� �3_ <br /> J L� <br /> PROJECT TITLE: <br /> AUTHORIZE THE CALL X Consent COUNCIL BILL# <br /> FOR BIDS FOR THE HOLLY Action Originating Department ENG/PS <br /> DRIVE PEDESTRIAN First Reading Contact Person Ryan Sass <br /> IMPROVEMENTS PROJECT Second Reading Phone Number 257-8942 <br /> Third Reading FOR AGENDA OF March 9, 2005 <br /> Public Hearing <br /> Initialed by: <br /> Depaittnent Head �1.� <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Holly Drive—Airport 2/22/05 Council Vicinity Map <br /> Road to 100th Street SW approved Ordinance No. <br /> 2825-05 <br /> Amount Budgeted $ 2,066,516.00 Est. <br /> Expenditure Required Account Number(s): PW2957 <br /> Budget Remaining <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> The construction plans and specifications are complete and the project is ready to be advertised for <br /> construction bids. This project will construct pedestrian improvements on a segment of Holly Drive from <br /> 100th Street S.W. to Airport Road. The improvements will include sidewalks, curbs, gutters,bicycle lanes, <br /> drainage facilities, striping, and wetland mitigation. <br /> The funding sources for this project are as follows: <br /> CMAQ—Federal Grant $ 1,449,703 <br /> TIB—State Grant 149,500 <br /> Fund 119—Street Improvements 36,550 <br /> Fund 157—Traffic Mitigation 322,427 <br /> Fund 158—Boeing Mitigation 68,861 <br /> Fund 301 —Arterial Streets 39,475 <br /> Total Estimated Funds $ 2,066,516 <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the call for bids for the Holly Drive Pedestrian Improvements Project. <br /> W02957-Bid Call.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.