Laserfiche WebLink
CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR: Marshbank Construction ADDRESS: P 0 Box 97 <br /> CITY: Lake Stevens STATE: WA 98258-0097 DATE: April 11, 2005 <br /> PROJECT TITLE: 112th St. SE Improvements, Phse 1 WORK ORDER NO. 2440, 3051 <br /> DATE WORK COMPLETE: March 11, 2005 FINAL AMOUNT: $ 559;050763 ki <br /> 41020;71(o . Os <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> understand the same and that I hereby release the City of Everett from an . d"aU,tclaims of whatsoever nature <br /> which I ma have arising out of the performance of said contract, which ark J .f t 'irk said estimate. <br /> X • P I I <br /> CONTRACTOR TITLE <br /> y c :o NOTARY m0 <br /> Marshbank Construction PUBLIC <br /> � r„ 22 oCD /A:°: <br /> Subscribe. and sworn to befo e <br /> e this day of V �� <br /> �'��. WASH\ <br /> 4..LJ lin 11. . �gimp otary Public <br /> in and for the State o Washington, residing atSafitalkAJAk. �'' ' <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final APPROVED Date: <br /> estimate to be based upon actual <br /> measurements and to be true and correct. <br /> X 5,02.cie2, X 31 <br /> z7r) <br /> Construction Manager Utilities Director <br /> Tom Fuchs Tom Thetford <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 9/94 <br />