Laserfiche WebLink
Run Date: 4/15/2005 City of Everett- Public Works Department Cutoff Date: 4/15/2008 <br /> Time: 10:56 AM Contract Estimate Voucher <br /> Project: 174 For Work Order#3184 Contractor: RINKER MATERIALS <br /> 2004 HOT MIX ASPHALT OVERLAY Estimate#6 P 0 BOX 2037 <br /> WO 3184 BID:$8£+,891-68"f3jo,'7tcE:.90 EVERETT WA 98203 <br /> TOTAL BID:$8349768:46 if',2C, 7414"),-t-c, <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item # Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Mobilization LS 10,500.00 1.00 1.0000 1.0000 0.0000, 10,500.00 10,500.00 0.00 <br /> 0002 Traffic control labor HR 36.00 1,800.00 3,277.0000 3,277.0000 0.0000 117,972.00 117,972,00 0.00 <br /> [ 0003 Maintenance&protec tion of traffic control LS 12,500.00 1.00 1.0000 1.0000 0.0000 1 12,500.00 12,500.00 0.00 <br /> %.7:-0004 HMA class B,PG 64-22(modified) TN 39.50 8,992.00 8,507.1200 8,507.1200 0.0000 336,031.24 336,031.24 0.00 <br /> 0005 HMA classB,PG64-22 for pre-leveling(mod) TN 39.50 2,903.00 1,526.5100 1,526.5100 0.0000 60,297.15 60,297.15 0.00 <br /> 0006 Adjust manhole to grade EA 350.00 68.00 57.5000 57.5000 0.0000 20,125.00 20,125.00 0.00 <br /> 0007 Adjust catch basin/inlet to grade EA 265.00 118.00 58.0000 58.0000 0.0000 15,370.00 15,370.00 0.00 <br /> 0008 Adjust valve box to grade EA 100.00 75.00 60.0000 60.0000 0.0000 6,000.00 6,000.00 0.00 <br /> 0009 Adjust existing monu ment casting to grade EA 100.00 13.00 16.0000 16.0000 0.0000 1,600.00 1,600.00 0.00 <br /> 0010 Planing bituminous pavement(0"•6")high SY 2.10 54,409.00 58,410.0000 58,410,0000 0.0000 122,661.00 122,661.00 0.00 <br /> 0011 Temporary pavement marking LF 0.15 20,500.00 51,168.0000 51,168;0000 0.0000 7,675.20 7,675.20 0.00 <br /> 0012 Vehicle loop detectors LF 12.50 2,000.00. 2,500.0000 2,500.0000 0.0000 31,250.00 31,250.00 0.00 <br /> 0013 Paint line LF 0.11 8,200.00 22,455.0000 22,455.0000 0.0000 2,470.05 2,470.05 0.00 <br /> 0014 Plastic 8"wide line LF 0.95 400.00 1,324,0000 1,324.0000 0.0000 1,257.80 1,257.80 0.00 <br /> 0015 Plastic traffic arrow EA 50.00 24.00 35.0000 35.0000 0.0000 1,750.00 1,750.00 0.00 <br /> 0016 24"plastic crosswalk stripe LF 3.00 1,300.00 1,992.0000 1,992.0000 0.0000 5,976.00 5,976.00 0.00 <br /> 0017 24"plastic stop line LF 3.00 405.00 861.0000 861.0000 0.0000 2,583.00 2,583.00 0.00 <br /> 0018 Painted 8"wide line LF 0.15 8,400.00 9,245.0000 9,245.0000 0.0000 1,386.75 1,386.75 0.00 <br /> 0019 Painted bicycle symbol EA 25.00 24.00 29.0000 29.0000 0.0000 725.00 725.00 0.00 <br /> 0020 Raised pavement marker,type 1 HUND 180.00 30.00 25.8000 25.8000 0.0000 4,644.00 4,644.00 0.00 <br /> 0021 Raised pavement marker,type 2 HUND 250.00 11.00 8.3400 8.3400 0.0000 2,085.00 2,085.00 0.00 <br /> 0022 Street cleaning HR 120.00 20.00 22.6000 22.6000 0.0000 2,712.00 2,712.00 0.00 <br /> 0023 Force account • FA 1.00 8,000.00 40,573.2100 40,573.2100 0.0000✓ 40,573.21 40,573.21 . 0.00 <br /> 0024 Vehicle loop detectors over 125%of plan LF 14.00 0.00 1,591.0000 1,461.0000 1.30.0000 " 22,274.00 20,454.00 1,820.00 <br /> quan. <br /> 0025 Plastic railroad crossing symbol EA 350.00 0.00 1.0000 1.0000 0.0000 - 350.00 350.00 0.00 <br /> GO <br /> U4".. <br />