Laserfiche WebLink
r � <br /> everett INSPECTION REPORT <br /> � Address <br /> Contractor l/' <br /> � <br /> Owner <br /> Date �,/�// ��� <br /> �-�-- <br /> TYPE OF INSPECTION REQUESTED <br /> ❑ BLDG: Pmt. No. ❑ MECH: Pmt. No. <br /> �ELEC: Pmt. No. ��❑ pLBG: Pmt. No. <br /> ❑ Temp. Elect. ❑ Masonry ❑Consultation <br /> ❑ Footing ❑ Framing ❑ Groundwork <br /> ❑ Foundation ❑ Drywall, Nailing ❑ truct. Slak <br /> !7 Ductwork ❑ Rough-In �inal <br /> ❑ Wood Stove ❑ Service ❑ �� <br /> ❑ Gas Piping t <br /> PPROVAL ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUIRED <br /> ❑ Corrections listed below MUST BE MADE before work can be approved. <br /> ❑ Please contact inspector and arrange for appoiniment. <br /> ❑ Was not able to perform �nspection. <br /> ❑ CALL 25��$�� REINSPECTION--24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> Inspeclor ��_Date <br />