Laserfiche WebLink
CLOSED C!I F10RK �RDER� 12EPORT <br /> � ' Total Utility Maintenance Management System page 1 <br /> 11/06/1996 <br />� Date Range :O1/09/1989 - 11/O5/1996 <br /> CM Work Order Range :1001091070001 - UT2600-02- Pattern :7101236730239 <br />� Item Range :<Blank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL _________________ <br /> I CM WORK ORDER ID: 7101236730239 Title: INSTALL 4718 EVERGREEN WAY ' <br /> I «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: -- <br /> Location ID: -- Activit 673 <br /> Program 710 Function 123 Y <br /> Date Completed: 10/02/1996 <br /> overall Craft: <br /> Issued: 09/25/1996 Issued by: HDA Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: HN <br /> ��r' Planned Hrs Actual Hrs Cost <br /> Craft ID Name __________ __________ <br /> ----------------------------- ----------- <br /> HEO AAL ARNOLD, ARTHiJR L 0.00 24.00 471.12 <br /> SUP1 AGA AHLES, GREGORY A. 0.00 3 .00 65.73 <br /> EO EJA ELLIOTT, JAMES A. 0.00 3.00 56.16 <br /> UL HLF HUSBY, LARRY FRANK 0.00 4.00 52.28 <br /> DL KKM KARELS, KEVIN MICHAEL LYNN 0.00 24.00 204.00 <br /> HEO LDC LITZ, DAVID C. 0.00 4.00 79•12 <br /> EO MJL2 MITCHELL, JEFFREY L. 0.00 22.50 427.73 <br /> UL NCR NIETHAMER, CHARLES R. 0.00 24.00 362.64 <br /> EO SR SIERRA, RAMON (NMI) 0.00 2.00 _____37_74 <br /> Total Labor Cost: 1756.52 <br /> IQaterials: <br /> ID Description Date # Used __ Cost___ <br /> ----- -------- -------- <br /> BRIC00061156 BRICK CONCRETE 2" X 4" X 8" 10/02/1996 13 5.33 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 09/30/1996 2 23.84 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 10/02/1996 1 11.92 <br /> ELL046302247 ELL 8" 22 1/2 DEG SP X GASKET 10/O1/1996 1 15.71 <br /> N/A C.D.F. (ASSOC) 09/30/1996 1 134.88 <br /> N/A FRAME/GRATE (ASSOC) 09/30/1996 1 211.49 <br /> N/A TOP COARSE 10/03/1996 5 69.40 <br /> N/A CB15/RISER (ASSOC) 10/03/1996 1 38.84 <br /> N/A C.D.F. (ASSOC) 10/08/1996 1 188.83 <br /> N/A CB15/FRAME/GRATE (ASSOC) 10/08/1996 1 211.49 <br /> N/A ASPHALT (ASSOC) 09/30/1996 65 14� <br /> PIPE46304347' PIPE S PVC SEWER <br /> PIPE46304347 PIPE 8" PVC SEWER 10/O1/1996 26 57.46 <br /> PIPE46304347 PIPE 8" PVC SEWER 10/O1/1996 39 86.19 <br /> PIPE46304347 PIPE 8" PVC SEWER 10/02/1996 146 ____322_66 <br /> Total Material Cost: _ jo�o� <br /> �CL��� , �. <br /> �_-� <br />